Wildfires Today

Where the world is burning right now — every active fire NASA's satellites detected in the last 24 hours, ranked by country. Updated every 30 minutes.

Last updated Aug 5, 08:01 PM UTC · NASA FIRMS / VIIRS

Advertisement
80,811
Active hotspots
1,030
High intensity
71
Countries affected
964,534
Total MW
-10.04, 18.61 · 526 MW · 2026-08-0565.16, 105.75 · 523 MW · 2026-08-0564.37, 97.40 · 485 MW · 2026-08-0564.37, 97.40 · 485 MW · 2026-08-0538.93, -112.19 · 469 MW · 2026-08-0564.35, 97.39 · 404 MW · 2026-08-0564.35, 97.39 · 404 MW · 2026-08-0564.36, 97.39 · 404 MW · 2026-08-05-9.52, 24.12 · 384 MW · 2026-08-05-9.52, 24.12 · 384 MW · 2026-08-05-7.37, 25.03 · 368 MW · 2026-08-05-7.37, 25.03 · 368 MW · 2026-08-05-7.37, 25.02 · 368 MW · 2026-08-05-7.36, 25.03 · 368 MW · 2026-08-05-7.39, 25.03 · 365 MW · 2026-08-05-7.38, 25.04 · 365 MW · 2026-08-05-7.38, 25.03 · 365 MW · 2026-08-05-7.38, 25.03 · 365 MW · 2026-08-0564.22, 115.06 · 359 MW · 2026-08-0564.36, 97.40 · 353 MW · 2026-08-0564.36, 97.41 · 353 MW · 2026-08-0564.36, 97.40 · 353 MW · 2026-08-05-20.98, 130.93 · 347 MW · 2026-08-05-7.79, 29.46 · 345 MW · 2026-08-05-7.39, 25.04 · 335 MW · 2026-08-05-7.39, 25.03 · 335 MW · 2026-08-05-7.39, 25.04 · 335 MW · 2026-08-05-8.36, 24.90 · 334 MW · 2026-08-05-8.36, 24.90 · 334 MW · 2026-08-05-8.35, 24.90 · 334 MW · 2026-08-05-8.35, 24.91 · 333 MW · 2026-08-05-8.35, 24.91 · 333 MW · 2026-08-05-8.35, 24.90 · 333 MW · 2026-08-05-8.35, 24.91 · 333 MW · 2026-08-05-7.01, 25.12 · 329 MW · 2026-08-05-7.01, 25.12 · 329 MW · 2026-08-0564.34, 97.37 · 329 MW · 2026-08-0564.34, 97.38 · 329 MW · 2026-08-0564.47, 100.92 · 328 MW · 2026-08-0564.47, 100.90 · 328 MW · 2026-08-05-8.36, 24.91 · 327 MW · 2026-08-05-8.36, 24.92 · 327 MW · 2026-08-05-8.35, 24.91 · 327 MW · 2026-08-05-8.35, 24.92 · 327 MW · 2026-08-05-8.86, 24.43 · 326 MW · 2026-08-05-8.85, 24.43 · 326 MW · 2026-08-05-8.85, 24.44 · 326 MW · 2026-08-05-23.64, 23.39 · 321 MW · 2026-08-05-7.57, 25.70 · 321 MW · 2026-08-05-7.37, 25.01 · 299 MW · 2026-08-05-7.37, 25.02 · 299 MW · 2026-08-05-7.36, 25.02 · 299 MW · 2026-08-0563.85, 95.42 · 298 MW · 2026-08-0563.85, 95.43 · 298 MW · 2026-08-0538.93, -112.24 · 293 MW · 2026-08-05-7.05, 14.58 · 291 MW · 2026-08-05-7.38, 25.03 · 289 MW · 2026-08-05-7.38, 25.04 · 289 MW · 2026-08-05-7.37, 25.03 · 289 MW · 2026-08-05-7.37, 25.04 · 289 MW · 2026-08-05-7.37, 25.03 · 289 MW · 2026-08-05-7.37, 25.03 · 289 MW · 2026-08-0559.80, 89.68 · 274 MW · 2026-08-0559.80, 89.68 · 274 MW · 2026-08-0559.80, 89.67 · 274 MW · 2026-08-0559.80, 89.68 · 274 MW · 2026-08-05-8.52, 17.36 · 271 MW · 2026-08-05-8.52, 17.37 · 271 MW · 2026-08-05-8.52, 17.36 · 271 MW · 2026-08-05-8.74, 22.23 · 266 MW · 2026-08-05-8.73, 22.22 · 266 MW · 2026-08-05-8.73, 22.23 · 266 MW · 2026-08-05-8.85, 24.40 · 263 MW · 2026-08-05-8.86, 24.41 · 263 MW · 2026-08-05-8.86, 24.42 · 263 MW · 2026-08-0565.15, 105.75 · 262 MW · 2026-08-05-9.30, 24.56 · 261 MW · 2026-08-05-9.30, 24.57 · 261 MW · 2026-08-05-9.30, 24.56 · 261 MW · 2026-08-05-8.74, 22.22 · 260 MW · 2026-08-05-8.74, 22.22 · 260 MW · 2026-08-05-8.74, 22.22 · 260 MW · 2026-08-05-8.73, 22.22 · 260 MW · 2026-08-05-7.38, 25.01 · 256 MW · 2026-08-05-7.37, 25.01 · 256 MW · 2026-08-05-7.37, 25.02 · 256 MW · 2026-08-0547.46, 38.78 · 252 MW · 2026-08-05-8.35, 24.92 · 252 MW · 2026-08-05-8.35, 24.92 · 252 MW · 2026-08-05-8.34, 24.92 · 252 MW · 2026-08-05-8.34, 24.92 · 252 MW · 2026-08-0538.70, -112.31 · 250 MW · 2026-08-0568.26, 107.42 · 247 MW · 2026-08-0568.27, 107.42 · 247 MW · 2026-08-05-4.06, 15.00 · 246 MW · 2026-08-05-8.36, 24.89 · 243 MW · 2026-08-05-5.58, 14.29 · 242 MW · 2026-08-05-8.85, 24.41 · 242 MW · 2026-08-05-8.85, 24.42 · 242 MW · 2026-08-05-8.85, 24.41 · 242 MW · 2026-08-05-8.85, 24.42 · 242 MW · 2026-08-0548.00, -120.41 · 240 MW · 2026-08-05-8.86, 24.43 · 239 MW · 2026-08-05-8.86, 24.43 · 239 MW · 2026-08-05-8.86, 24.42 · 239 MW · 2026-08-05-8.86, 24.43 · 239 MW · 2026-08-05-8.86, 24.44 · 238 MW · 2026-08-05-8.86, 24.44 · 238 MW · 2026-08-05-8.86, 24.44 · 238 MW · 2026-08-05-8.85, 24.44 · 238 MW · 2026-08-05-10.28, 19.38 · 237 MW · 2026-08-05-10.28, 19.39 · 237 MW · 2026-08-05-10.27, 19.39 · 237 MW · 2026-08-05-8.97, 22.49 · 235 MW · 2026-08-05-7.79, 29.46 · 235 MW · 2026-08-05-7.79, 29.46 · 235 MW · 2026-08-0565.17, 105.74 · 233 MW · 2026-08-0565.14, 105.77 · 232 MW · 2026-08-0565.14, 105.78 · 232 MW · 2026-08-0565.14, 105.77 · 232 MW · 2026-08-0565.14, 105.78 · 232 MW · 2026-08-0544.47, -120.55 · 232 MW · 2026-08-0544.47, -120.54 · 232 MW · 2026-08-05-8.51, 25.66 · 232 MW · 2026-08-05-7.01, 25.12 · 230 MW · 2026-08-05-8.08, 24.96 · 229 MW · 2026-08-05-8.07, 24.97 · 229 MW · 2026-08-05-8.86, 24.42 · 229 MW · 2026-08-05-8.86, 24.43 · 229 MW · 2026-08-05-8.86, 24.42 · 229 MW · 2026-08-05-8.85, 24.43 · 229 MW · 2026-08-05-9.04, 23.68 · 228 MW · 2026-08-05-9.66, 19.81 · 226 MW · 2026-08-0564.36, 97.40 · 226 MW · 2026-08-0564.36, 115.82 · 226 MW · 2026-08-0564.36, 115.82 · 226 MW · 2026-08-0554.44, 37.47 · 223 MW · 2026-08-05-8.12, 24.95 · 222 MW · 2026-08-05-9.28, 24.56 · 222 MW · 2026-08-0565.77, 99.32 · 222 MW · 2026-08-0565.31, 107.28 · 221 MW · 2026-08-0564.23, 114.91 · 220 MW · 2026-08-0565.38, 107.33 · 216 MW · 2026-08-0565.38, 107.34 · 216 MW · 2026-08-0565.38, 107.34 · 216 MW · 2026-08-05-8.87, 24.42 · 216 MW · 2026-08-05-8.86, 24.42 · 216 MW · 2026-08-0538.81, -112.26 · 214 MW · 2026-08-05-7.39, 25.03 · 214 MW · 2026-08-05-8.63, 24.47 · 214 MW · 2026-08-05-7.05, 14.58 · 214 MW · 2026-08-05-8.78, 17.01 · 213 MW · 2026-08-0565.77, 99.34 · 213 MW · 2026-08-0565.77, 99.35 · 213 MW · 2026-08-0565.77, 99.34 · 213 MW · 2026-08-0564.95, 83.96 · 212 MW · 2026-08-0559.31, 90.97 · 210 MW · 2026-08-0559.31, 90.97 · 210 MW · 2026-08-0559.31, 90.97 · 210 MW · 2026-08-05-8.85, 24.41 · 207 MW · 2026-08-05-8.85, 24.41 · 207 MW · 2026-08-05-8.84, 24.41 · 207 MW · 2026-08-05-8.84, 24.41 · 207 MW · 2026-08-05-8.98, 23.82 · 207 MW · 2026-08-0548.71, -119.88 · 206 MW · 2026-08-0548.71, -119.87 · 206 MW · 2026-08-0548.71, -119.88 · 206 MW · 2026-08-0548.71, -119.88 · 206 MW · 2026-08-05-9.90, 29.45 · 204 MW · 2026-08-0564.37, 115.68 · 204 MW · 2026-08-0564.34, 97.38 · 203 MW · 2026-08-0564.34, 97.39 · 203 MW · 2026-08-05-10.49, 21.09 · 202 MW · 2026-08-0565.32, 107.28 · 202 MW · 2026-08-05-7.57, 25.71 · 201 MW · 2026-08-05-7.57, 25.71 · 201 MW · 2026-08-0565.17, 105.71 · 201 MW · 2026-08-0538.76, -112.26 · 201 MW · 2026-08-05-14.19, 21.46 · 199 MW · 2026-08-05-8.86, 24.45 · 197 MW · 2026-08-05-8.85, 24.44 · 197 MW · 2026-08-05-8.85, 24.45 · 197 MW · 2026-08-05-8.34, 24.90 · 197 MW · 2026-08-05-8.34, 24.91 · 197 MW · 2026-08-05-8.73, 22.21 · 197 MW · 2026-08-05-8.73, 22.22 · 197 MW · 2026-08-05-8.72, 22.21 · 197 MW · 2026-08-05-8.72, 22.22 · 197 MW · 2026-08-0564.90, 102.10 · 197 MW · 2026-08-0564.90, 102.11 · 197 MW · 2026-08-0564.90, 102.11 · 197 MW · 2026-08-05-15.45, 15.17 · 197 MW · 2026-08-05-15.45, 15.18 · 197 MW · 2026-08-05-15.44, 15.18 · 197 MW · 2026-08-05-11.30, -44.82 · 196 MW · 2026-08-05-11.30, -44.81 · 196 MW · 2026-08-05-11.29, -44.82 · 196 MW · 2026-08-05-11.29, -44.81 · 196 MW · 2026-08-05-6.71, -58.95 · 196 MW · 2026-08-05-8.74, 22.22 · 196 MW · 2026-08-05-8.74, 22.23 · 196 MW · 2026-08-05-8.74, 22.22 · 196 MW · 2026-08-05-8.73, 22.23 · 196 MW · 2026-08-05-10.35, 19.64 · 196 MW · 2026-08-05-10.35, 19.64 · 196 MW · 2026-08-05-10.35, 19.64 · 196 MW · 2026-08-05-20.00, 29.00 · 195 MW · 2026-08-0544.37, -119.72 · 195 MW · 2026-08-05-11.16, 20.25 · 195 MW · 2026-08-05-7.04, 26.99 · 194 MW · 2026-08-05-17.62, 34.43 · 192 MW · 2026-08-050.32, 110.35 · 192 MW · 2026-08-05-7.01, 25.10 · 191 MW · 2026-08-05-3.61, 18.01 · 191 MW · 2026-08-05-3.60, 18.01 · 191 MW · 2026-08-05-8.78, 17.01 · 191 MW · 2026-08-05-8.78, 17.02 · 191 MW · 2026-08-05-8.78, 17.01 · 191 MW · 2026-08-05-5.64, 26.45 · 190 MW · 2026-08-0541.70, 15.54 · 189 MW · 2026-08-05-7.02, 25.10 · 189 MW · 2026-08-05-7.02, 25.11 · 189 MW · 2026-08-05-7.02, 25.11 · 189 MW · 2026-08-05-7.02, 25.12 · 189 MW · 2026-08-05-7.01, 25.11 · 189 MW · 2026-08-05-7.01, 25.12 · 189 MW · 2026-08-05-8.66, 25.35 · 187 MW · 2026-08-05-20.98, 130.94 · 187 MW · 2026-08-05-20.97, 130.94 · 187 MW · 2026-08-05-10.54, 21.03 · 186 MW · 2026-08-0568.26, 107.40 · 185 MW · 2026-08-0568.26, 107.41 · 185 MW · 2026-08-0568.26, 107.40 · 185 MW · 2026-08-0568.27, 107.41 · 185 MW · 2026-08-05-8.20, 30.11 · 185 MW · 2026-08-0565.16, 105.73 · 185 MW · 2026-08-0565.16, 105.75 · 185 MW · 2026-08-0565.17, 105.73 · 185 MW · 2026-08-0564.73, 91.75 · 184 MW · 2026-08-05-28.37, 32.27 · 184 MW · 2026-08-0544.47, -120.55 · 184 MW · 2026-08-0544.47, -120.54 · 184 MW · 2026-08-0544.47, -120.55 · 184 MW · 2026-08-05-6.60, 15.02 · 184 MW · 2026-08-0545.28, -121.51 · 184 MW · 2026-08-0564.02, 112.35 · 183 MW · 2026-08-05-21.17, -50.25 · 182 MW · 2026-08-05-9.30, 19.63 · 182 MW · 2026-08-05-19.10, 123.19 · 182 MW · 2026-08-05-10.47, 22.15 · 180 MW · 2026-08-05-8.26, 25.66 · 179 MW · 2026-08-05-9.52, 24.08 · 179 MW · 2026-08-05-9.31, 24.58 · 179 MW · 2026-08-05-9.31, 24.58 · 179 MW · 2026-08-0538.94, -112.20 · 178 MW · 2026-08-0538.95, -112.20 · 178 MW · 2026-08-0564.47, 100.81 · 177 MW · 2026-08-0564.48, 100.82 · 177 MW · 2026-08-0564.48, 100.82 · 177 MW · 2026-08-05-8.36, 24.89 · 177 MW · 2026-08-05-8.36, 24.90 · 177 MW · 2026-08-05-8.35, 24.89 · 177 MW · 2026-08-05-8.35, 24.90 · 177 MW · 2026-08-0568.14, 106.02 · 176 MW · 2026-08-0568.14, 106.04 · 176 MW · 2026-08-05-19.10, 123.19 · 176 MW · 2026-08-0564.37, 97.39 · 174 MW · 2026-08-0564.37, 97.39 · 174 MW · 2026-08-05-9.32, 24.86 · 174 MW · 2026-08-05-8.51, 25.65 · 174 MW · 2026-08-05-8.50, 25.64 · 174 MW · 2026-08-05-8.51, 25.66 · 174 MW · 2026-08-05-8.50, 25.66 · 174 MW · 2026-08-0564.90, 110.81 · 174 MW · 2026-08-0564.90, 110.82 · 174 MW · 2026-08-0564.90, 110.81 · 174 MW · 2026-08-0564.90, 110.82 · 174 MW · 2026-08-0568.14, 105.99 · 173 MW · 2026-08-0568.14, 106.01 · 173 MW · 2026-08-0568.15, 105.99 · 173 MW · 2026-08-0568.15, 106.01 · 173 MW · 2026-08-0567.95, 84.03 · 172 MW · 2026-08-0567.95, 84.02 · 172 MW · 2026-08-0567.95, 84.03 · 172 MW · 2026-08-05-7.38, 25.02 · 171 MW · 2026-08-05-7.38, 25.02 · 171 MW · 2026-08-05-7.38, 25.02 · 171 MW · 2026-08-05-7.38, 25.02 · 171 MW · 2026-08-0538.08, -107.31 · 169 MW · 2026-08-0538.08, -107.31 · 169 MW · 2026-08-0538.08, -107.31 · 169 MW · 2026-08-0538.08, -107.31 · 169 MW · 2026-08-0565.32, 107.28 · 168 MW · 2026-08-05-10.10, 15.76 · 168 MW · 2026-08-05-6.21, 14.69 · 168 MW · 2026-08-05-5.84, 14.42 · 167 MW · 2026-08-05-7.57, 25.71 · 166 MW · 2026-08-0565.37, 107.34 · 166 MW · 2026-08-0565.37, 107.34 · 166 MW · 2026-08-0565.37, 107.35 · 166 MW · 2026-08-0551.26, -121.88 · 166 MW · 2026-08-05-8.25, 25.67 · 165 MW · 2026-08-05-9.30, 24.56 · 165 MW · 2026-08-05-9.30, 24.56 · 165 MW · 2026-08-05-6.90, 29.40 · 165 MW · 2026-08-0564.90, 102.11 · 165 MW · 2026-08-0564.90, 102.12 · 165 MW · 2026-08-0564.91, 102.11 · 165 MW · 2026-08-0564.91, 102.12 · 165 MW · 2026-08-05-8.34, 24.89 · 165 MW · 2026-08-05-8.34, 24.90 · 165 MW · 2026-08-05-26.99, 24.87 · 165 MW · 2026-08-05-26.99, 24.87 · 165 MW · 2026-08-0538.69, -112.34 · 164 MW · 2026-08-05-8.74, 22.22 · 164 MW · 2026-08-05-8.74, 22.22 · 164 MW · 2026-08-05-8.74, 22.21 · 164 MW · 2026-08-05-8.74, 22.22 · 164 MW · 2026-08-0564.86, 103.06 · 163 MW · 2026-08-05-6.96, -71.67 · 162 MW · 2026-08-05-6.96, -71.66 · 162 MW · 2026-08-05-6.96, -71.67 · 162 MW · 2026-08-05-9.66, 19.82 · 162 MW · 2026-08-05-9.66, 19.82 · 162 MW · 2026-08-050.95, 111.20 · 161 MW · 2026-08-05-7.88, 20.91 · 161 MW · 2026-08-05-7.88, 20.90 · 161 MW · 2026-08-05-7.88, 20.91 · 161 MW · 2026-08-05-15.45, 15.17 · 161 MW · 2026-08-05-15.45, 15.18 · 161 MW · 2026-08-05-15.45, 15.17 · 161 MW · 2026-08-05-15.45, 15.18 · 161 MW · 2026-08-0559.93, 89.72 · 161 MW · 2026-08-0559.93, 89.73 · 161 MW · 2026-08-0559.94, 89.72 · 161 MW · 2026-08-0559.94, 89.72 · 161 MW · 2026-08-0564.00, 112.36 · 161 MW · 2026-08-0564.00, 112.35 · 161 MW · 2026-08-0564.01, 112.36 · 161 MW · 2026-08-0564.01, 112.35 · 161 MW · 2026-08-0568.26, 107.37 · 160 MW · 2026-08-0568.26, 107.39 · 160 MW · 2026-08-0568.26, 107.38 · 160 MW · 2026-08-05-8.73, 22.21 · 160 MW · 2026-08-05-8.73, 22.21 · 160 MW · 2026-08-05-8.73, 22.21 · 160 MW · 2026-08-0564.67, 109.96 · 159 MW · 2026-08-0564.67, 109.97 · 159 MW · 2026-08-0545.18, 65.30 · 159 MW · 2026-08-0564.36, 115.81 · 158 MW · 2026-08-0564.36, 115.81 · 158 MW · 2026-08-0564.36, 115.80 · 158 MW · 2026-08-0564.36, 115.81 · 158 MW · 2026-08-05-3.61, 18.01 · 158 MW · 2026-08-0535.91, -105.85 · 158 MW · 2026-08-0547.99, -120.42 · 157 MW · 2026-08-0547.99, -120.41 · 157 MW · 2026-08-0547.99, -120.43 · 157 MW · 2026-08-0547.99, -120.42 · 157 MW · 2026-08-05-8.35, 24.90 · 157 MW · 2026-08-05-8.35, 24.90 · 157 MW · 2026-08-05-8.34, 24.89 · 157 MW · 2026-08-05-8.34, 24.90 · 157 MW · 2026-08-0545.51, -113.31 · 156 MW · 2026-08-0567.94, 84.34 · 156 MW · 2026-08-05-9.49, 21.53 · 156 MW · 2026-08-05-8.08, 24.96 · 156 MW · 2026-08-05-8.08, 24.96 · 156 MW · 2026-08-05-8.07, 24.95 · 156 MW · 2026-08-05-8.07, 24.96 · 156 MW · 2026-08-0544.48, -120.55 · 156 MW · 2026-08-0564.35, 115.83 · 156 MW · 2026-08-05-10.80, 22.75 · 155 MW · 2026-08-0563.85, 95.44 · 155 MW · 2026-08-05-6.97, -71.66 · 155 MW · 2026-08-05-6.96, -71.67 · 155 MW · 2026-08-0568.10, 83.52 · 154 MW · 2026-08-0568.11, 83.52 · 154 MW · 2026-08-0568.11, 83.53 · 154 MW · 2026-08-0538.94, -112.19 · 154 MW · 2026-08-0538.94, -112.19 · 154 MW · 2026-08-05-9.04, 23.66 · 154 MW · 2026-08-05-9.04, 23.67 · 154 MW · 2026-08-0565.72, 99.73 · 153 MW · 2026-08-0565.72, 99.74 · 153 MW · 2026-08-0567.97, 84.03 · 153 MW · 2026-08-05-7.85, 17.47 · 153 MW · 2026-08-05-8.68, 25.35 · 152 MW · 2026-08-05-8.68, 25.36 · 152 MW · 2026-08-05-8.67, 25.35 · 152 MW · 2026-08-05-7.87, 20.90 · 151 MW · 2026-08-05-7.87, 20.91 · 151 MW · 2026-08-05-7.87, 20.90 · 151 MW · 2026-08-0538.09, -107.36 · 151 MW · 2026-08-0538.09, -107.35 · 151 MW · 2026-08-0538.10, -107.36 · 151 MW · 2026-08-0538.10, -107.35 · 151 MW · 2026-08-05-15.81, 39.26 · 151 MW · 2026-08-0544.38, -119.73 · 150 MW · 2026-08-05-20.01, 29.01 · 150 MW · 2026-08-05-20.00, 29.00 · 150 MW · 2026-08-05-7.87, 22.83 · 149 MW · 2026-08-05-7.86, 22.83 · 149 MW · 2026-08-05-9.51, 24.13 · 149 MW · 2026-08-05-9.51, 24.13 · 149 MW · 2026-08-05-8.11, 24.96 · 149 MW · 2026-08-05-8.11, 24.96 · 149 MW · 2026-08-05-10.30, 22.91 · 148 MW · 2026-08-05-10.80, 22.74 · 148 MW · 2026-08-05-17.72, 21.43 · 148 MW · 2026-08-0565.21, 98.00 · 147 MW · 2026-08-05-20.98, 130.95 · 147 MW · 2026-08-05-18.29, 33.60 · 147 MW · 2026-08-05-18.29, 33.60 · 147 MW · 2026-08-05-18.28, 33.60 · 147 MW · 2026-08-05-18.28, 33.60 · 147 MW · 2026-08-05-8.11, 24.96 · 147 MW · 2026-08-05-8.11, 24.96 · 147 MW · 2026-08-05-8.10, 24.95 · 147 MW · 2026-08-05-8.10, 24.96 · 147 MW · 2026-08-0538.68, -112.33 · 145 MW · 2026-08-0568.25, 107.41 · 145 MW · 2026-08-0568.26, 107.42 · 145 MW · 2026-08-05-6.27, 32.45 · 145 MW · 2026-08-05-6.27, 32.45 · 145 MW · 2026-08-05-14.33, 27.21 · 145 MW · 2026-08-0564.98, 110.19 · 145 MW · 2026-08-0564.98, 110.20 · 145 MW · 2026-08-0564.98, 110.19 · 145 MW · 2026-08-0564.98, 110.20 · 145 MW · 2026-08-05-28.37, 32.28 · 144 MW · 2026-08-0565.74, 115.06 · 144 MW · 2026-08-05-7.78, 29.46 · 143 MW · 2026-08-05-9.29, 19.61 · 143 MW · 2026-08-0564.01, 112.37 · 143 MW · 2026-08-0564.01, 112.36 · 143 MW · 2026-08-0564.01, 112.37 · 143 MW · 2026-08-0564.01, 112.36 · 143 MW · 2026-08-0548.00, -120.42 · 143 MW · 2026-08-05-7.78, 29.46 · 143 MW · 2026-08-05-7.78, 29.46 · 143 MW · 2026-08-0564.34, 97.36 · 143 MW · 2026-08-05-15.22, 19.47 · 142 MW · 2026-08-0565.86, 100.33 · 142 MW · 2026-08-0565.86, 100.34 · 142 MW · 2026-08-0565.86, 100.32 · 142 MW · 2026-08-0565.87, 100.33 · 142 MW · 2026-08-0564.33, 97.37 · 142 MW · 2026-08-0564.34, 97.37 · 142 MW · 2026-08-0564.34, 97.37 · 142 MW · 2026-08-05-4.22, 28.17 · 142 MW · 2026-08-0564.90, 102.12 · 141 MW · 2026-08-0564.90, 102.13 · 141 MW · 2026-08-0564.91, 102.12 · 141 MW · 2026-08-0564.91, 102.13 · 141 MW · 2026-08-05-28.37, 32.27 · 141 MW · 2026-08-05-7.00, 25.13 · 140 MW · 2026-08-05-7.00, 25.13 · 140 MW · 2026-08-0568.26, 107.41 · 140 MW · 2026-08-0568.26, 107.41 · 140 MW · 2026-08-05-7.03, 17.00 · 140 MW · 2026-08-05-7.03, 17.00 · 140 MW · 2026-08-0568.13, 105.99 · 139 MW · 2026-08-0568.13, 106.01 · 139 MW · 2026-08-0568.14, 105.99 · 139 MW · 2026-08-0568.14, 106.01 · 139 MW · 2026-08-0564.99, 110.19 · 139 MW · 2026-08-0564.99, 110.20 · 139 MW · 2026-08-0564.99, 110.19 · 139 MW · 2026-08-0565.00, 110.20 · 139 MW · 2026-08-05-8.86, 24.40 · 138 MW · 2026-08-05-8.85, 24.41 · 138 MW · 2026-08-05-8.85, 24.40 · 138 MW · 2026-08-05-8.94, 19.15 · 138 MW · 2026-08-05-8.93, 19.15 · 138 MW · 2026-08-05-8.98, 22.56 · 138 MW · 2026-08-05-8.97, 22.56 · 138 MW · 2026-08-0562.96, 81.03 · 137 MW · 2026-08-0562.96, 81.02 · 137 MW · 2026-08-0562.96, 81.03 · 137 MW · 2026-08-0564.01, 112.34 · 137 MW · 2026-08-0564.01, 112.35 · 137 MW · 2026-08-0564.01, 112.34 · 137 MW · 2026-08-05-10.81, 22.75 · 137 MW · 2026-08-05-10.81, 22.75 · 137 MW · 2026-08-05-26.65, 27.29 · 137 MW · 2026-08-05-26.65, 27.29 · 137 MW · 2026-08-05-8.68, 25.33 · 137 MW · 2026-08-05-8.68, 25.34 · 137 MW · 2026-08-05-8.67, 25.33 · 137 MW · 2026-08-05-8.67, 25.34 · 137 MW · 2026-08-05-12.98, 16.81 · 137 MW · 2026-08-0564.86, 110.78 · 136 MW · 2026-08-0564.86, 110.78 · 136 MW · 2026-08-0565.00, 110.15 · 136 MW · 2026-08-0565.00, 110.16 · 136 MW · 2026-08-0565.00, 110.15 · 136 MW · 2026-08-0565.00, 110.15 · 136 MW · 2026-08-05-11.67, 131.15 · 135 MW · 2026-08-05-5.69, 14.80 · 135 MW · 2026-08-0545.52, -113.33 · 135 MW · 2026-08-05-4.06, 15.00 · 135 MW · 2026-08-05-9.30, 24.58 · 134 MW · 2026-08-05-9.29, 24.57 · 134 MW · 2026-08-05-9.29, 24.58 · 134 MW · 2026-08-05-5.98, 13.89 · 134 MW · 2026-08-05-9.71, 19.62 · 134 MW · 2026-08-05-10.28, 19.37 · 134 MW · 2026-08-05-10.28, 19.38 · 134 MW · 2026-08-05-10.28, 19.37 · 134 MW · 2026-08-05-10.27, 19.38 · 134 MW · 2026-08-05-7.64, 26.15 · 134 MW · 2026-08-05-7.64, 26.16 · 134 MW · 2026-08-05-7.63, 26.16 · 134 MW · 2026-08-0564.34, 97.37 · 134 MW · 2026-08-0564.35, 97.37 · 134 MW · 2026-08-05-8.94, 19.14 · 134 MW · 2026-08-05-8.93, 19.14 · 134 MW · 2026-08-05-8.93, 19.14 · 134 MW · 2026-08-0565.72, 99.74 · 134 MW · 2026-08-05-7.01, 25.11 · 134 MW · 2026-08-05-7.01, 25.12 · 134 MW · 2026-08-05-7.00, 25.12 · 134 MW · 2026-08-05-7.99, 20.04 · 133 MW · 2026-08-05-7.99, 20.04 · 133 MW · 2026-08-05-10.46, 22.14 · 133 MW · 2026-08-0563.47, 109.17 · 133 MW · 2026-08-0563.47, 109.16 · 133 MW · 2026-08-05-28.01, 30.29 · 133 MW · 2026-08-05-10.84, 22.68 · 133 MW · 2026-08-0538.93, -112.24 · 132 MW · 2026-08-057.07, -74.80 · 132 MW · 2026-08-05-26.66, 27.29 · 132 MW · 2026-08-05-26.65, 27.28 · 132 MW · 2026-08-05-10.34, 26.49 · 132 MW · 2026-08-05-20.98, 130.89 · 131 MW · 2026-08-05-20.97, 130.89 · 131 MW · 2026-08-05-9.31, 19.61 · 131 MW · 2026-08-05-9.30, 19.61 · 131 MW · 2026-08-05-9.30, 19.61 · 131 MW · 2026-08-0565.30, 107.31 · 131 MW · 2026-08-0564.90, 102.13 · 131 MW · 2026-08-0564.91, 102.13 · 131 MW · 2026-08-05-8.36, 24.92 · 130 MW · 2026-08-05-8.36, 24.93 · 130 MW · 2026-08-05-8.35, 24.92 · 130 MW · 2026-08-05-8.35, 24.93 · 130 MW · 2026-08-05-10.34, 26.49 · 130 MW · 2026-08-05-10.34, 26.50 · 130 MW · 2026-08-05-11.29, -44.82 · 130 MW · 2026-08-05-10.18, 20.48 · 129 MW · 2026-08-05-10.18, 20.49 · 129 MW · 2026-08-0551.26, -121.35 · 129 MW · 2026-08-0551.27, -121.35 · 129 MW · 2026-08-0551.27, -121.35 · 129 MW · 2026-08-05-8.07, 24.96 · 129 MW · 2026-08-05-8.07, 24.97 · 129 MW · 2026-08-05-8.06, 24.96 · 129 MW · 2026-08-05-8.11, 23.45 · 129 MW · 2026-08-05-8.23, 25.05 · 129 MW · 2026-08-05-10.06, 18.81 · 128 MW · 2026-08-05-10.05, 18.81 · 128 MW · 2026-08-05-10.05, 18.81 · 128 MW · 2026-08-0564.00, 112.50 · 128 MW · 2026-08-05-10.20, 20.51 · 128 MW · 2026-08-05-10.20, 20.51 · 128 MW · 2026-08-05-10.20, 20.50 · 128 MW · 2026-08-05-10.20, 20.51 · 128 MW · 2026-08-05-7.12, 17.24 · 128 MW · 2026-08-0564.33, 97.38 · 128 MW · 2026-08-0530.36, 29.70 · 128 MW · 2026-08-05-7.99, 20.05 · 127 MW · 2026-08-05-7.99, 20.05 · 127 MW · 2026-08-0548.83, 35.79 · 127 MW · 2026-08-05-11.13, 20.57 · 127 MW · 2026-08-05-11.13, 20.57 · 127 MW · 2026-08-05-9.31, 24.86 · 127 MW · 2026-08-05-9.30, 24.85 · 127 MW · 2026-08-05-9.30, 24.85 · 127 MW · 2026-08-05-6.96, -71.67 · 127 MW · 2026-08-05-6.96, -71.67 · 127 MW · 2026-08-05-6.58, 25.28 · 127 MW · 2026-08-05-6.57, 25.28 · 127 MW · 2026-08-05-8.66, 25.34 · 127 MW · 2026-08-05-8.66, 25.35 · 127 MW · 2026-08-0563.21, 109.80 · 127 MW · 2026-08-0563.21, 109.81 · 127 MW · 2026-08-05-9.29, 24.57 · 126 MW · 2026-08-05-9.28, 24.57 · 126 MW · 2026-08-05-28.01, 30.28 · 126 MW · 2026-08-05-8.43, 23.39 · 126 MW · 2026-08-05-9.24, 22.56 · 125 MW · 2026-08-05-8.08, 24.95 · 125 MW · 2026-08-05-8.08, 24.96 · 125 MW · 2026-08-05-8.08, 24.95 · 125 MW · 2026-08-05-8.07, 24.96 · 125 MW · 2026-08-05-10.60, 21.44 · 125 MW · 2026-08-05-10.60, 21.45 · 125 MW · 2026-08-05-10.60, 21.44 · 125 MW · 2026-08-05-10.60, 21.44 · 125 MW · 2026-08-0568.25, 107.46 · 124 MW · 2026-08-0568.26, 107.46 · 124 MW · 2026-08-0568.26, 107.47 · 124 MW · 2026-08-05-8.51, 25.65 · 124 MW · 2026-08-05-8.50, 25.65 · 124 MW · 2026-08-0541.70, 15.54 · 124 MW · 2026-08-0541.70, 15.55 · 124 MW · 2026-08-05-7.02, 16.98 · 124 MW · 2026-08-05-7.02, 16.98 · 124 MW · 2026-08-05-7.02, 16.98 · 124 MW · 2026-08-05-8.13, 25.26 · 124 MW · 2026-08-05-8.12, 25.25 · 124 MW · 2026-08-05-8.12, 25.26 · 124 MW · 2026-08-05-21.17, -50.24 · 124 MW · 2026-08-05-9.31, 24.84 · 124 MW · 2026-08-05-9.31, 24.85 · 124 MW · 2026-08-05-3.60, 13.52 · 124 MW · 2026-08-05-8.57, 21.72 · 123 MW · 2026-08-05-4.28, 13.29 · 123 MW · 2026-08-0564.35, 97.42 · 123 MW · 2026-08-0564.35, 97.42 · 123 MW · 2026-08-0564.35, 97.41 · 123 MW · 2026-08-0564.35, 97.42 · 123 MW · 2026-08-05-21.16, -50.25 · 123 MW · 2026-08-0545.51, -113.31 · 122 MW · 2026-08-0545.52, -113.30 · 122 MW · 2026-08-05-8.07, 24.96 · 122 MW · 2026-08-05-8.07, 24.97 · 122 MW · 2026-08-05-8.06, 24.96 · 122 MW · 2026-08-05-8.06, 24.97 · 122 MW · 2026-08-05-19.38, 45.75 · 121 MW · 2026-08-05-7.38, 22.57 · 121 MW · 2026-08-05-4.99, 14.51 · 121 MW · 2026-08-0546.35, 33.80 · 121 MW · 2026-08-0546.35, 33.80 · 121 MW · 2026-08-0564.34, 115.82 · 121 MW · 2026-08-0564.34, 115.83 · 121 MW · 2026-08-0564.34, 115.82 · 121 MW · 2026-08-05-6.64, 26.23 · 121 MW · 2026-08-05-6.64, 26.24 · 121 MW · 2026-08-0565.32, 107.28 · 120 MW · 2026-08-0565.32, 107.29 · 120 MW · 2026-08-0565.87, 100.30 · 120 MW · 2026-08-0565.87, 100.31 · 120 MW · 2026-08-05-0.04, 111.06 · 120 MW · 2026-08-0568.10, 105.21 · 120 MW · 2026-08-0568.11, 105.21 · 120 MW · 2026-08-05-29.05, 31.67 · 120 MW · 2026-08-05-29.05, 31.67 · 120 MW · 2026-08-05-29.04, 31.66 · 120 MW · 2026-08-0528.91, 19.78 · 120 MW · 2026-08-05-10.80, 22.74 · 120 MW · 2026-08-05-9.79, 21.81 · 120 MW · 2026-08-05-18.03, 35.08 · 120 MW · 2026-08-05-13.26, 27.74 · 120 MW · 2026-08-0565.73, 99.63 · 119 MW · 2026-08-05-9.62, 24.29 · 119 MW · 2026-08-05-9.62, 24.29 · 119 MW · 2026-08-05-8.96, 22.56 · 119 MW · 2026-08-0551.23, -122.70 · 119 MW · 2026-08-0551.24, -122.69 · 119 MW · 2026-08-0551.24, -122.70 · 119 MW · 2026-08-0551.24, -122.70 · 119 MW · 2026-08-05-9.18, 19.21 · 119 MW · 2026-08-0568.40, 83.69 · 119 MW · 2026-08-05-8.68, 25.34 · 119 MW · 2026-08-05-8.68, 25.35 · 119 MW · 2026-08-05-8.67, 25.34 · 119 MW · 2026-08-05-8.67, 25.35 · 119 MW · 2026-08-050.25, 110.54 · 119 MW · 2026-08-05-15.22, 19.45 · 118 MW · 2026-08-05-15.22, 19.46 · 118 MW · 2026-08-05-15.22, 19.46 · 118 MW · 2026-08-05-8.44, 23.38 · 118 MW · 2026-08-05-8.43, 23.38 · 118 MW · 2026-08-05-8.43, 23.39 · 118 MW · 2026-08-05-8.86, 18.65 · 118 MW · 2026-08-0538.93, -112.21 · 118 MW · 2026-08-0538.94, -112.21 · 118 MW · 2026-08-0538.94, -112.20 · 118 MW · 2026-08-0565.38, 107.34 · 118 MW · 2026-08-0565.38, 107.34 · 118 MW · 2026-08-0565.38, 107.34 · 118 MW · 2026-08-0565.38, 107.34 · 118 MW · 2026-08-05-7.06, -49.21 · 118 MW · 2026-08-05-7.05, -49.21 · 118 MW · 2026-08-05-7.05, -49.21 · 118 MW · 2026-08-05-14.94, 25.01 · 118 MW · 2026-08-0565.15, 105.73 · 118 MW · 2026-08-0565.15, 105.74 · 118 MW · 2026-08-0565.16, 105.72 · 118 MW · 2026-08-0565.16, 105.73 · 118 MW · 2026-08-05-9.08, -61.37 · 117 MW · 2026-08-05-10.50, 21.09 · 117 MW · 2026-08-05-10.31, 21.18 · 117 MW · 2026-08-05-10.30, 21.19 · 117 MW · 2026-08-05-10.30, 21.18 · 117 MW · 2026-08-05-10.30, 21.18 · 117 MW · 2026-08-0544.47, -120.56 · 117 MW · 2026-08-0544.47, -120.55 · 117 MW · 2026-08-0544.47, -120.56 · 117 MW · 2026-08-0544.48, -120.55 · 117 MW · 2026-08-0542.40, -116.84 · 117 MW · 2026-08-0564.89, 110.83 · 117 MW · 2026-08-05-9.05, 23.67 · 117 MW · 2026-08-05-9.04, 23.67 · 117 MW · 2026-08-05-9.04, 23.67 · 117 MW · 2026-08-05-9.04, 23.67 · 117 MW · 2026-08-05-7.00, 25.12 · 117 MW · 2026-08-05-7.00, 25.13 · 117 MW · 2026-08-05-7.00, 25.12 · 117 MW · 2026-08-05-6.99, 25.13 · 117 MW · 2026-08-05-8.52, 17.36 · 116 MW · 2026-08-05-8.51, 17.36 · 116 MW · 2026-08-05-8.51, 17.36 · 116 MW · 2026-08-0538.69, -112.45 · 116 MW · 2026-08-0538.69, -112.45 · 116 MW · 2026-08-05-21.17, -50.24 · 116 MW · 2026-08-05-10.10, 15.75 · 116 MW · 2026-08-05-10.38, 19.30 · 116 MW · 2026-08-05-14.67, 32.67 · 116 MW · 2026-08-05-14.67, 32.67 · 116 MW · 2026-08-05-14.67, 32.67 · 116 MW · 2026-08-05-8.07, 24.95 · 116 MW · 2026-08-05-8.07, 24.96 · 116 MW · 2026-08-05-8.06, 24.95 · 116 MW · 2026-08-05-8.06, 24.96 · 116 MW · 2026-08-0564.00, 112.34 · 116 MW · 2026-08-05-6.76, 15.50 · 115 MW · 2026-08-0538.77, -112.25 · 115 MW · 2026-08-05-9.34, 18.81 · 115 MW · 2026-08-05-9.34, 18.81 · 115 MW · 2026-08-05-9.33, 18.81 · 115 MW · 2026-08-05-12.28, 20.04 · 115 MW · 2026-08-0564.35, 97.42 · 115 MW · 2026-08-0564.35, 97.42 · 115 MW · 2026-08-0538.81, -112.25 · 115 MW · 2026-08-05-8.63, 24.47 · 115 MW · 2026-08-05-8.62, 24.47 · 115 MW · 2026-08-05-7.78, 29.45 · 115 MW · 2026-08-050.22, 114.68 · 115 MW · 2026-08-05-23.64, 23.38 · 115 MW · 2026-08-05-9.06, 19.34 · 114 MW · 2026-08-0564.72, 91.68 · 114 MW · 2026-08-05-8.74, 22.21 · 114 MW · 2026-08-05-8.74, 22.21 · 114 MW · 2026-08-05-8.74, 22.21 · 114 MW · 2026-08-05-8.74, 22.21 · 114 MW · 2026-08-0559.80, 89.67 · 114 MW · 2026-08-0559.80, 89.67 · 114 MW · 2026-08-0563.98, 112.50 · 113 MW · 2026-08-0568.11, 83.48 · 113 MW · 2026-08-0568.11, 83.48 · 113 MW · 2026-08-0568.11, 83.48 · 113 MW · 2026-08-05-10.54, 21.02 · 113 MW · 2026-08-05-10.54, 21.02 · 113 MW · 2026-08-0563.85, 95.43 · 113 MW · 2026-08-0563.85, 95.42 · 113 MW · 2026-08-0563.85, 95.43 · 113 MW · 2026-08-05-8.09, 24.96 · 113 MW · 2026-08-05-8.09, 24.95 · 113 MW · 2026-08-05-8.09, 24.96 · 113 MW · 2026-08-05-8.94, 19.14 · 113 MW · 2026-08-05-20.06, 44.71 · 113 MW · 2026-08-05-20.06, 44.71 · 113 MW · 2026-08-05-11.17, 20.25 · 113 MW · 2026-08-05-19.36, 134.51 · 112 MW · 2026-08-05-7.39, 25.02 · 112 MW · 2026-08-05-7.38, 25.02 · 112 MW · 2026-08-05-10.23, 20.09 · 112 MW · 2026-08-0565.70, 117.20 · 112 MW · 2026-08-05-8.73, 22.23 · 112 MW · 2026-08-05-8.73, 22.24 · 112 MW · 2026-08-05-8.72, 22.23 · 112 MW · 2026-08-05-8.72, 22.23 · 112 MW · 2026-08-0548.71, -119.89 · 111 MW · 2026-08-0548.71, -119.88 · 111 MW · 2026-08-0548.71, -119.89 · 111 MW · 2026-08-0548.71, -119.88 · 111 MW · 2026-08-05-9.64, 24.27 · 111 MW · 2026-08-05-9.64, 24.28 · 111 MW · 2026-08-05-9.63, 24.27 · 111 MW · 2026-08-05-9.63, 24.27 · 111 MW · 2026-08-05-7.08, 17.95 · 111 MW · 2026-08-05-27.00, 24.86 · 111 MW · 2026-08-05-26.99, 24.87 · 111 MW · 2026-08-05-26.99, 24.86 · 111 MW · 2026-08-05-26.99, 24.87 · 111 MW · 2026-08-05-10.28, 16.95 · 111 MW · 2026-08-0562.90, 92.59 · 111 MW · 2026-08-0562.90, 92.59 · 111 MW · 2026-08-05-26.65, 27.30 · 111 MW · 2026-08-05-7.30, 13.81 · 111 MW · 2026-08-0564.87, 110.74 · 111 MW · 2026-08-05-8.95, 24.73 · 111 MW · 2026-08-05-8.95, 24.74 · 111 MW · 2026-08-05-8.94, 24.73 · 111 MW · 2026-08-05-9.64, 24.27 · 111 MW · 2026-08-05-9.64, 24.28 · 111 MW · 2026-08-05-9.63, 24.27 · 111 MW · 2026-08-05-9.63, 24.28 · 111 MW · 2026-08-05-5.50, 26.89 · 111 MW · 2026-08-05-5.49, 26.89 · 111 MW · 2026-08-0542.75, -110.47 · 110 MW · 2026-08-0542.76, -110.46 · 110 MW · 2026-08-0542.76, -110.47 · 110 MW · 2026-08-05-9.31, 24.84 · 110 MW · 2026-08-05-9.31, 24.84 · 110 MW · 2026-08-05-3.58, 18.35 · 110 MW · 2026-08-05-3.58, 18.35 · 110 MW · 2026-08-0551.36, -122.05 · 110 MW · 2026-08-05-7.39, 25.03 · 110 MW · 2026-08-05-7.39, 25.04 · 110 MW · 2026-08-05-9.29, 24.77 · 110 MW · 2026-08-05-9.08, 22.75 · 110 MW · 2026-08-05-9.08, 22.74 · 110 MW · 2026-08-05-7.38, 25.04 · 110 MW · 2026-08-05-7.38, 25.05 · 110 MW · 2026-08-05-7.38, 25.04 · 110 MW · 2026-08-05-7.38, 25.05 · 110 MW · 2026-08-05-2.47, 113.09 · 110 MW · 2026-08-05-8.86, 24.45 · 110 MW · 2026-08-05-8.86, 24.45 · 110 MW · 2026-08-05-8.85, 24.45 · 110 MW · 2026-08-05-8.85, 24.45 · 110 MW · 2026-08-0551.26, -121.36 · 110 MW · 2026-08-0551.26, -121.35 · 110 MW · 2026-08-0551.26, -121.36 · 110 MW · 2026-08-0551.27, -121.35 · 110 MW · 2026-08-05-7.15, 26.44 · 110 MW · 2026-08-05-6.60, 14.49 · 109 MW · 2026-08-0547.71, 35.13 · 109 MW · 2026-08-0547.71, 35.13 · 109 MW · 2026-08-0547.71, 35.13 · 109 MW · 2026-08-0559.93, 89.72 · 109 MW · 2026-08-0559.93, 89.73 · 109 MW · 2026-08-0559.93, 89.72 · 109 MW · 2026-08-0559.93, 89.73 · 109 MW · 2026-08-0568.10, 105.24 · 109 MW · 2026-08-0568.11, 105.24 · 109 MW · 2026-08-0568.11, 105.25 · 109 MW · 2026-08-0564.36, 115.80 · 109 MW · 2026-08-0564.36, 115.80 · 109 MW · 2026-08-0564.36, 115.79 · 109 MW · 2026-08-0564.36, 115.80 · 109 MW · 2026-08-0538.98, 39.47 · 109 MW · 2026-08-05-10.46, 22.16 · 109 MW · 2026-08-05-10.46, 22.16 · 109 MW · 2026-08-05-10.45, 22.16 · 109 MW · 2026-08-05-9.32, 24.88 · 109 MW · 2026-08-05-9.32, 24.88 · 109 MW · 2026-08-05-9.30, 24.59 · 109 MW · 2026-08-05-8.98, 22.55 · 109 MW · 2026-08-05-8.98, 22.55 · 109 MW · 2026-08-0565.76, 99.32 · 109 MW · 2026-08-0565.76, 99.33 · 109 MW · 2026-08-0565.76, 99.32 · 109 MW · 2026-08-0565.77, 99.33 · 109 MW · 2026-08-05-6.48, 18.20 · 109 MW · 2026-08-0564.98, 110.16 · 108 MW · 2026-08-0564.98, 110.17 · 108 MW · 2026-08-0564.99, 110.16 · 108 MW · 2026-08-0564.99, 110.17 · 108 MW · 2026-08-05-8.53, 25.60 · 108 MW · 2026-08-05-8.53, 25.61 · 108 MW · 2026-08-0548.04, -120.59 · 108 MW · 2026-08-05-13.07, 15.97 · 108 MW · 2026-08-05-8.98, 23.82 · 108 MW · 2026-08-0551.35, -122.04 · 108 MW · 2026-08-0551.35, -122.03 · 108 MW · 2026-08-0551.35, -122.04 · 108 MW · 2026-08-0551.35, -122.04 · 108 MW · 2026-08-0564.70, 110.47 · 108 MW · 2026-08-05-8.73, 22.22 · 108 MW · 2026-08-05-8.73, 22.23 · 108 MW · 2026-08-05-8.72, 22.22 · 108 MW · 2026-08-05-8.72, 22.23 · 108 MW · 2026-08-0567.96, 84.04 · 108 MW · 2026-08-0567.96, 84.03 · 108 MW · 2026-08-0567.96, 84.04 · 108 MW · 2026-08-05-8.08, 24.97 · 107 MW · 2026-08-05-8.07, 24.96 · 107 MW · 2026-08-05-8.07, 24.97 · 107 MW · 2026-08-0546.62, 35.08 · 107 MW · 2026-08-05-13.49, 40.19 · 107 MW · 2026-08-05-13.48, 40.19 · 107 MW · 2026-08-05-10.29, 21.18 · 107 MW · 2026-08-05-2.89, 14.54 · 107 MW · 2026-08-05-9.97, 17.02 · 107 MW · 2026-08-0551.34, -122.05 · 107 MW · 2026-08-0551.34, -122.04 · 107 MW · 2026-08-0551.35, -122.05 · 107 MW · 2026-08-0551.35, -122.05 · 107 MW · 2026-08-05-5.86, 18.52 · 106 MW · 2026-08-05-8.67, 31.27 · 106 MW · 2026-08-05-16.15, 21.76 · 106 MW · 2026-08-0568.25, 107.45 · 106 MW · 2026-08-0568.25, 107.46 · 106 MW · 2026-08-0568.26, 107.45 · 106 MW · 2026-08-0568.26, 107.45 · 106 MW · 2026-08-0564.35, 97.41 · 106 MW · 2026-08-0564.35, 97.41 · 106 MW · 2026-08-0564.35, 97.40 · 106 MW · 2026-08-0564.35, 97.41 · 106 MW · 2026-08-0559.31, 91.00 · 106 MW · 2026-08-0559.31, 91.00 · 106 MW · 2026-08-05-9.28, 24.58 · 106 MW · 2026-08-05-20.53, 127.90 · 106 MW · 2026-08-05-9.64, 24.28 · 106 MW · 2026-08-05-9.63, 24.28 · 106 MW · 2026-08-05-9.63, 24.29 · 106 MW · 2026-08-05-8.63, 24.47 · 106 MW · 2026-08-05-8.62, 24.46 · 106 MW · 2026-08-05-15.17, 47.45 · 106 MW · 2026-08-05-15.16, 47.45 · 106 MW · 2026-08-05-10.48, 22.14 · 106 MW · 2026-08-0547.27, 34.44 · 106 MW · 2026-08-05-9.88, 27.02 · 105 MW · 2026-08-05-11.24, 16.51 · 105 MW · 2026-08-05-11.23, 16.51 · 105 MW · 2026-08-0544.47, -120.54 · 105 MW · 2026-08-0544.48, -120.54 · 105 MW · 2026-08-0564.72, 91.69 · 105 MW · 2026-08-0564.72, 91.68 · 105 MW · 2026-08-05-8.14, 25.25 · 105 MW · 2026-08-05-7.05, 26.99 · 105 MW · 2026-08-05-8.35, 24.91 · 105 MW · 2026-08-05-8.35, 24.91 · 105 MW · 2026-08-05-8.34, 24.91 · 105 MW · 2026-08-05-8.34, 24.91 · 105 MW · 2026-08-05-9.32, 24.85 · 105 MW · 2026-08-05-9.31, 24.86 · 105 MW · 2026-08-05-9.31, 24.85 · 105 MW · 2026-08-05-9.31, 24.86 · 105 MW · 2026-08-05-8.92, 23.63 · 104 MW · 2026-08-05-8.91, 23.63 · 104 MW · 2026-08-05-3.93, 14.36 · 104 MW · 2026-08-05-3.92, 14.36 · 104 MW · 2026-08-0565.70, 99.71 · 104 MW · 2026-08-0565.71, 99.70 · 104 MW · 2026-08-0565.71, 99.71 · 104 MW · 2026-08-05-6.76, 15.51 · 104 MW · 2026-08-05-6.12, 32.34 · 104 MW · 2026-08-0564.38, 115.66 · 104 MW · 2026-08-0564.39, 115.66 · 104 MW · 2026-08-05-8.91, 19.60 · 104 MW · 2026-08-05-8.90, 19.59 · 104 MW · 2026-08-0559.31, 90.99 · 104 MW · 2026-08-0559.31, 90.99 · 104 MW · 2026-08-0559.31, 91.00 · 104 MW · 2026-08-05-9.29, 24.56 · 103 MW · 2026-08-05-9.28, 24.56 · 103 MW · 2026-08-05-7.79, 29.45 · 103 MW · 2026-08-05-7.79, 29.45 · 103 MW · 2026-08-05-20.96, 130.88 · 103 MW · 2026-08-05-20.96, 130.89 · 103 MW · 2026-08-0564.20, 97.61 · 103 MW · 2026-08-0551.28, -121.91 · 103 MW · 2026-08-0551.28, -121.91 · 103 MW · 2026-08-0565.87, 100.32 · 103 MW · 2026-08-0565.87, 100.33 · 103 MW · 2026-08-0565.87, 100.32 · 103 MW · 2026-08-0565.87, 100.33 · 103 MW · 2026-08-0564.30, 107.20 · 103 MW · 2026-08-0564.30, 107.20 · 103 MW · 2026-08-0538.69, -112.34 · 103 MW · 2026-08-05-7.25, 28.69 · 103 MW · 2026-08-05-7.25, 28.69 · 103 MW · 2026-08-05-13.88, 17.20 · 103 MW · 2026-08-05-13.88, 15.51 · 103 MW · 2026-08-0568.26, 107.43 · 102 MW · 2026-08-05-8.44, 23.38 · 102 MW · 2026-08-05-8.43, 23.38 · 102 MW · 2026-08-0565.70, 99.72 · 102 MW · 2026-08-0565.70, 99.73 · 102 MW · 2026-08-0565.70, 99.71 · 102 MW · 2026-08-0565.86, 100.31 · 102 MW · 2026-08-05-8.59, 18.87 · 102 MW · 2026-08-05-8.59, 18.87 · 102 MW · 2026-08-05-8.02, 18.13 · 102 MW · 2026-08-0542.37, -116.91 · 102 MW · 2026-08-0565.13, 105.77 · 102 MW · 2026-08-0565.13, 105.79 · 102 MW · 2026-08-0565.13, 105.78 · 102 MW · 2026-08-05-10.87, 19.37 · 102 MW · 2026-08-05-10.86, 19.37 · 102 MW · 2026-08-05-8.36, 24.89 · 102 MW · 2026-08-05-8.36, 24.89 · 102 MW · 2026-08-05-8.36, 24.89 · 102 MW · 2026-08-0564.37, 106.92 · 102 MW · 2026-08-0564.37, 106.91 · 102 MW · 2026-08-0564.37, 106.92 · 102 MW · 2026-08-0564.99, 110.16 · 102 MW · 2026-08-0564.99, 110.16 · 102 MW · 2026-08-0564.99, 110.15 · 102 MW · 2026-08-0564.99, 110.16 · 102 MW · 2026-08-05-20.98, 130.92 · 102 MW · 2026-08-05-20.98, 130.93 · 102 MW · 2026-08-05-17.15, 31.28 · 102 MW · 2026-08-05-14.82, 33.14 · 102 MW · 2026-08-0538.96, -112.20 · 102 MW · 2026-08-0538.96, -112.19 · 102 MW · 2026-08-05-10.59, 18.99 · 101 MW · 2026-08-05-10.59, 18.99 · 101 MW · 2026-08-05-0.57, 111.28 · 101 MW · 2026-08-05-0.56, 111.28 · 101 MW · 2026-08-0547.96, -120.60 · 101 MW · 2026-08-0548.88, -120.64 · 101 MW · 2026-08-05-4.48, 13.48 · 101 MW · 2026-08-05-20.98, 130.94 · 101 MW · 2026-08-05-20.98, 130.94 · 101 MW · 2026-08-05-20.97, 130.95 · 101 MW · 2026-08-05-8.58, 18.88 · 101 MW · 2026-08-05-8.58, 18.88 · 101 MW · 2026-08-05-15.35, 20.17 · 101 MW · 2026-08-05-15.35, 20.17 · 101 MW · 2026-08-05-15.35, 20.17 · 101 MW · 2026-08-0538.78, -112.26 · 100 MW · 2026-08-0538.78, -112.25 · 100 MW · 2026-08-0565.36, 107.35 · 100 MW · 2026-08-05-10.29, 16.94 · 100 MW · 2026-08-0568.58, 108.65 · 100 MW · 2026-08-0559.67, 90.32 · 100 MW · 2026-08-0559.67, 90.33 · 100 MW · 2026-08-05-6.25, 13.24 · 100 MW · 2026-08-05-12.40, 27.92 · 100 MW · 2026-08-0549.97, 50.05 · 100 MW · 2026-08-0549.97, 50.05 · 100 MW · 2026-08-0549.97, 50.04 · 100 MW · 2026-08-0549.97, 50.05 · 100 MW · 2026-08-05-8.06, 23.56 · 100 MW · 2026-08-05-8.06, 23.57 · 100 MW · 2026-08-05-1.62, 110.08 · 100 MW · 2026-08-05-1.61, 110.08 · 100 MW · 2026-08-0565.74, 115.04 · 100 MW · 2026-08-0564.23, 114.92 · 100 MW · 2026-08-05-3.61, 18.02 · 100 MW · 2026-08-05-20.98, 130.89 · 100 MW · 2026-08-05-20.97, 130.89 · 100 MW · 2026-08-0568.26, 107.38 · 99 MW · 2026-08-0568.26, 107.39 · 99 MW · 2026-08-0568.26, 107.38 · 99 MW · 2026-08-0568.26, 107.39 · 99 MW · 2026-08-05-10.89, 19.40 · 99 MW · 2026-08-05-10.89, 19.40 · 99 MW · 2026-08-0551.24, -122.69 · 99 MW · 2026-08-0567.94, 84.40 · 99 MW · 2026-08-0565.71, 117.20 · 99 MW · 2026-08-0565.71, 117.19 · 99 MW · 2026-08-05-8.09, 24.96 · 98 MW · 2026-08-05-8.09, 24.96 · 98 MW · 2026-08-05-9.32, 24.86 · 98 MW · 2026-08-05-9.32, 24.87 · 98 MW · 2026-08-05-9.32, 24.86 · 98 MW · 2026-08-05-9.63, 24.28 · 98 MW · 2026-08-05-9.62, 24.28 · 98 MW · 2026-08-05-9.62, 24.28 · 98 MW · 2026-08-05-9.62, 24.28 · 98 MW · 2026-08-050.76, 116.87 · 98 MW · 2026-08-05-9.29, 24.75 · 98 MW · 2026-08-0564.33, 107.16 · 98 MW · 2026-08-0564.33, 97.38 · 98 MW · 2026-08-0564.33, 97.39 · 98 MW · 2026-08-0564.33, 97.37 · 98 MW · 2026-08-0564.33, 97.38 · 98 MW · 2026-08-050.88, 111.24 · 98 MW · 2026-08-0568.78, 107.82 · 98 MW · 2026-08-0568.78, 107.82 · 98 MW · 2026-08-05-1.71, 110.18 · 98 MW · 2026-08-05-7.00, 25.11 · 97 MW · 2026-08-05-7.00, 25.11 · 97 MW · 2026-08-05-7.00, 25.11 · 97 MW · 2026-08-05-9.07, 22.74 · 97 MW · 2026-08-05-9.07, 22.75 · 97 MW · 2026-08-05-9.07, 22.74 · 97 MW · 2026-08-05-8.92, 23.63 · 97 MW · 2026-08-05-8.92, 23.63 · 97 MW · 2026-08-05-11.45, 16.10 · 97 MW · 2026-08-05-11.45, 16.11 · 97 MW · 2026-08-05-7.63, 26.16 · 97 MW · 2026-08-05-7.63, 26.17 · 97 MW · 2026-08-0564.37, 115.69 · 97 MW · 2026-08-0564.38, 115.69 · 97 MW · 2026-08-0564.38, 115.68 · 97 MW · 2026-08-05-27.00, 24.86 · 97 MW · 2026-08-05-27.00, 24.87 · 97 MW · 2026-08-05-17.15, 30.63 · 97 MW · 2026-08-05-17.14, 30.62 · 97 MW · 2026-08-0548.00, -120.43 · 96 MW · 2026-08-0548.00, -120.42 · 96 MW · 2026-08-0548.00, -120.43 · 96 MW · 2026-08-0548.00, -120.43 · 96 MW · 2026-08-05-10.32, 21.18 · 96 MW · 2026-08-05-10.32, 21.19 · 96 MW · 2026-08-05-10.31, 21.18 · 96 MW · 2026-08-05-10.31, 21.19 · 96 MW · 2026-08-0545.57, 41.63 · 96 MW · 2026-08-0545.58, 41.63 · 96 MW · 2026-08-05-8.07, 24.95 · 96 MW · 2026-08-05-8.07, 24.96 · 96 MW · 2026-08-05-8.06, 24.95 · 96 MW · 2026-08-05-8.06, 24.96 · 96 MW · 2026-08-05-8.84, 24.41 · 96 MW · 2026-08-05-8.84, 24.41 · 96 MW · 2026-08-05-9.63, 24.28 · 96 MW · 2026-08-05-9.62, 24.29 · 96 MW · 2026-08-05-9.62, 24.28 · 96 MW · 2026-08-05-9.62, 24.28 · 96 MW · 2026-08-0565.38, 107.32 · 96 MW · 2026-08-0565.38, 107.33 · 96 MW · 2026-08-0565.38, 107.32 · 96 MW · 2026-08-0565.38, 107.33 · 96 MW · 2026-08-0559.42, 89.41 · 95 MW · 2026-08-0559.42, 89.42 · 95 MW · 2026-08-0559.42, 89.41 · 95 MW · 2026-08-0564.33, 97.38 · 95 MW · 2026-08-0564.33, 97.39 · 95 MW · 2026-08-0564.33, 97.38 · 95 MW · 2026-08-0564.33, 97.39 · 95 MW · 2026-08-0564.34, 115.82 · 95 MW · 2026-08-0564.35, 115.82 · 95 MW · 2026-08-0564.35, 115.81 · 95 MW · 2026-08-0564.35, 115.82 · 95 MW · 2026-08-05-5.25, 15.02 · 95 MW · 2026-08-0564.00, 112.37 · 95 MW · 2026-08-0564.00, 112.36 · 95 MW · 2026-08-0567.96, 83.39 · 95 MW · 2026-08-05-5.90, 27.25 · 95 MW · 2026-08-05-29.05, 31.66 · 95 MW · 2026-08-05-29.04, 31.66 · 95 MW · 2026-08-05-8.37, 16.60 · 95 MW · 2026-08-05-8.36, 16.59 · 95 MW · 2026-08-05-8.36, 16.60 · 95 MW · 2026-08-05-6.11, 14.56 · 94 MW · 2026-08-05-6.11, 14.56 · 94 MW · 2026-08-05-6.11, 14.56 · 94 MW · 2026-08-0564.35, 97.41 · 94 MW · 2026-08-0564.35, 97.42 · 94 MW · 2026-08-0564.35, 97.41 · 94 MW · 2026-08-0564.36, 97.42 · 94 MW · 2026-08-05-9.63, 24.27 · 94 MW · 2026-08-05-9.63, 24.27 · 94 MW · 2026-08-05-9.62, 24.27 · 94 MW · 2026-08-0565.16, 105.74 · 94 MW · 2026-08-0565.16, 105.75 · 94 MW · 2026-08-0565.16, 105.74 · 94 MW · 2026-08-0565.16, 105.75 · 94 MW · 2026-08-05-10.34, 26.49 · 94 MW · 2026-08-05-10.34, 26.48 · 94 MW · 2026-08-05-10.34, 26.49 · 94 MW · 2026-08-05-10.05, 18.81 · 94 MW · 2026-08-05-8.11, 24.97 · 94 MW · 2026-08-05-8.11, 24.97 · 94 MW · 2026-08-05-8.10, 24.97 · 94 MW · 2026-08-05-8.10, 24.97 · 94 MW · 2026-08-05-11.12, 19.73 · 94 MW · 2026-08-05-11.12, 19.73 · 94 MW · 2026-08-05-9.04, 23.66 · 93 MW · 2026-08-0564.47, 100.92 · 93 MW · 2026-08-0564.48, 100.92 · 93 MW · 2026-08-0564.90, 102.10 · 93 MW · 2026-08-0564.91, 102.10 · 93 MW · 2026-08-05-7.23, 31.82 · 93 MW · 2026-08-0545.52, -113.30 · 93 MW · 2026-08-0564.00, 112.49 · 93 MW · 2026-08-05-9.50, 21.53 · 93 MW · 2026-08-05-9.49, 21.53 · 93 MW · 2026-08-05-9.49, 21.54 · 93 MW · 2026-08-05-4.43, 13.45 · 92 MW · 2026-08-05-4.43, 13.46 · 92 MW · 2026-08-0528.91, 19.77 · 92 MW · 2026-08-05-9.79, 21.81 · 92 MW · 2026-08-0565.39, 107.32 · 92 MW · 2026-08-0565.39, 107.32 · 92 MW · 2026-08-05-28.56, 32.17 · 92 MW · 2026-08-05-28.55, 32.18 · 92 MW · 2026-08-05-8.34, 21.90 · 92 MW · 2026-08-05-8.33, 21.89 · 92 MW · 2026-08-05-8.33, 21.90 · 92 MW · 2026-08-05-8.51, 19.66 · 92 MW · 2026-08-05-8.51, 19.66 · 92 MW · 2026-08-05-7.63, 18.58 · 92 MW · 2026-08-05-7.63, 18.58 · 92 MW · 2026-08-05-12.51, 26.22 · 92 MW · 2026-08-05-12.51, 26.22 · 92 MW · 2026-08-0561.35, 112.82 · 92 MW · 2026-08-0561.35, 112.80 · 92 MW · 2026-08-05-9.64, 24.28 · 91 MW · 2026-08-05-9.63, 24.28 · 91 MW · 2026-08-05-9.63, 24.29 · 91 MW · 2026-08-05-20.98, 130.89 · 91 MW · 2026-08-05-20.98, 130.89 · 91 MW · 2026-08-05-20.97, 130.88 · 91 MW · 2026-08-05-20.97, 130.89 · 91 MW · 2026-08-05-7.07, 17.96 · 91 MW · 2026-08-0565.44, 107.87 · 91 MW · 2026-08-05-10.34, 26.48 · 91 MW · 2026-08-0559.63, 90.42 · 91 MW · 2026-08-0559.63, 90.43 · 91 MW · 2026-08-0559.63, 90.42 · 91 MW · 2026-08-05-9.08, 22.76 · 91 MW · 2026-08-05-9.07, 22.75 · 91 MW · 2026-08-05-9.07, 22.76 · 91 MW · 2026-08-05-17.62, 34.43 · 91 MW · 2026-08-05-8.53, 17.35 · 91 MW · 2026-08-05-8.52, 17.36 · 91 MW · 2026-08-05-8.52, 17.35 · 91 MW · 2026-08-05-8.52, 17.36 · 91 MW · 2026-08-05-7.63, 26.14 · 91 MW · 2026-08-05-7.63, 26.14 · 91 MW · 2026-08-05-4.22, 28.18 · 91 MW · 2026-08-05-4.22, 28.17 · 91 MW · 2026-08-05-9.83, 24.27 · 91 MW · 2026-08-05-27.40, 26.71 · 91 MW · 2026-08-0548.83, 35.79 · 90 MW · 2026-08-0547.95, -120.59 · 90 MW · 2026-08-0547.96, -120.59 · 90 MW · 2026-08-0542.73, -116.72 · 90 MW · 2026-08-0542.73, -116.71 · 90 MW · 2026-08-0542.73, -116.72 · 90 MW · 2026-08-0542.74, -116.72 · 90 MW · 2026-08-0565.75, 115.04 · 90 MW · 2026-08-0546.35, 33.80 · 90 MW · 2026-08-05-10.18, 22.63 · 90 MW · 2026-08-05-10.17, 22.63 · 90 MW · 2026-08-0568.26, 106.40 · 90 MW · 2026-08-05-6.97, 17.10 · 89 MW · 2026-08-05-11.82, 29.25 · 89 MW · 2026-08-05-8.37, 18.71 · 89 MW · 2026-08-05-8.36, 18.72 · 89 MW · 2026-08-05-8.36, 18.71 · 89 MW · 2026-08-0548.86, -119.76 · 89 MW · 2026-08-0548.86, -119.77 · 89 MW · 2026-08-05-9.63, 24.27 · 89 MW · 2026-08-05-9.63, 24.27 · 89 MW · 2026-08-05-9.62, 24.27 · 89 MW · 2026-08-05-9.62, 24.27 · 89 MW · 2026-08-05-8.07, 18.60 · 89 MW · 2026-08-0565.38, 107.29 · 89 MW · 2026-08-0565.38, 107.28 · 89 MW · 2026-08-05-8.84, 24.40 · 88 MW · 2026-08-05-17.80, 36.04 · 88 MW · 2026-08-05-10.07, 15.12 · 88 MW · 2026-08-0548.23, -118.36 · 88 MW · 2026-08-05-4.10, 14.51 · 88 MW · 2026-08-05-8.07, 24.94 · 88 MW · 2026-08-05-8.07, 24.95 · 88 MW · 2026-08-05-8.06, 24.94 · 88 MW · 2026-08-0564.85, 103.05 · 88 MW · 2026-08-0564.85, 103.06 · 88 MW · 2026-08-0564.86, 103.06 · 88 MW · 2026-08-05-12.35, -66.75 · 88 MW · 2026-08-05-12.35, -66.75 · 88 MW · 2026-08-05-27.41, 26.72 · 88 MW · 2026-08-05-6.58, 25.27 · 88 MW · 2026-08-05-6.58, 25.28 · 88 MW · 2026-08-05-6.57, 25.27 · 88 MW · 2026-08-05-6.57, 25.28 · 88 MW · 2026-08-0564.36, 97.38 · 88 MW · 2026-08-0564.36, 97.39 · 88 MW · 2026-08-0564.36, 97.38 · 88 MW · 2026-08-0564.36, 97.39 · 88 MW · 2026-08-05-8.75, 20.04 · 88 MW · 2026-08-05-9.30, 24.77 · 88 MW · 2026-08-05-23.65, 23.38 · 87 MW · 2026-08-05-23.64, 23.39 · 87 MW · 2026-08-05-23.64, 23.39 · 87 MW · 2026-08-05-3.14, -43.05 · 87 MW · 2026-08-0564.35, 115.80 · 87 MW · 2026-08-0564.36, 115.80 · 87 MW · 2026-08-0564.36, 115.79 · 87 MW · 2026-08-0564.36, 115.79 · 87 MW · 2026-08-0565.66, 107.79 · 87 MW · 2026-08-05-21.16, -50.25 · 87 MW · 2026-08-05-21.16, -50.25 · 87 MW · 2026-08-0550.50, -117.17 · 87 MW · 2026-08-057.07, -74.80 · 87 MW · 2026-08-057.07, -74.80 · 87 MW · 2026-08-05-10.18, 20.49 · 87 MW · 2026-08-05-10.18, 20.49 · 87 MW · 2026-08-05-9.30, 24.73 · 87 MW · 2026-08-05-9.30, 24.74 · 87 MW · 2026-08-050.23, 110.61 · 86 MW · 2026-08-0559.92, 89.70 · 86 MW · 2026-08-0564.90, 102.12 · 86 MW · 2026-08-0564.38, 115.66 · 86 MW · 2026-08-05-10.20, 16.90 · 86 MW · 2026-08-05-10.20, 16.91 · 86 MW · 2026-08-05-8.61, 24.27 · 86 MW · 2026-08-05-8.61, 24.28 · 86 MW · 2026-08-05-8.61, 24.27 · 86 MW · 2026-08-05-8.61, 24.28 · 86 MW · 2026-08-05-9.17, 19.21 · 86 MW · 2026-08-05-13.63, -49.94 · 86 MW · 2026-08-05-13.63, -49.93 · 86 MW · 2026-08-05-6.60, 15.01 · 86 MW · 2026-08-05-6.60, 15.01 · 86 MW · 2026-08-05-6.60, 15.01 · 86 MW · 2026-08-05-12.89, 17.31 · 85 MW · 2026-08-05-12.89, 17.32 · 85 MW · 2026-08-05-10.49, 21.10 · 85 MW · 2026-08-05-16.18, 19.84 · 85 MW · 2026-08-05-16.18, 19.84 · 85 MW · 2026-08-0545.57, 41.62 · 85 MW · 2026-08-0545.57, 41.62 · 85 MW · 2026-08-05-17.62, 21.60 · 85 MW · 2026-08-05-3.91, 14.35 · 85 MW · 2026-08-05-3.91, 14.36 · 85 MW · 2026-08-05-9.64, 24.27 · 85 MW · 2026-08-05-9.32, 24.88 · 85 MW · 2026-08-05-9.32, 24.88 · 85 MW · 2026-08-05-9.31, 24.87 · 85 MW · 2026-08-05-9.31, 24.88 · 85 MW · 2026-08-0565.14, 105.81 · 85 MW · 2026-08-0565.14, 105.80 · 85 MW · 2026-08-0565.14, 105.81 · 85 MW · 2026-08-05-8.23, 25.05 · 85 MW · 2026-08-05-8.22, 25.05 · 85 MW · 2026-08-05-12.36, 21.36 · 85 MW · 2026-08-05-10.61, 21.45 · 85 MW · 2026-08-05-10.60, 21.45 · 85 MW · 2026-08-0564.35, 97.37 · 84 MW · 2026-08-0564.35, 97.37 · 84 MW · 2026-08-0542.73, -116.71 · 84 MW · 2026-08-0542.74, -116.71 · 84 MW · 2026-08-0542.74, -116.71 · 84 MW · 2026-08-05-10.89, 19.40 · 84 MW · 2026-08-05-9.67, 19.82 · 84 MW · 2026-08-05-9.67, 19.82 · 84 MW · 2026-08-05-4.28, 18.92 · 84 MW · 2026-08-05-4.28, 18.93 · 84 MW · 2026-08-05-8.34, 21.89 · 84 MW · 2026-08-05-8.33, 21.89 · 84 MW · 2026-08-05-9.63, 24.29 · 84 MW · 2026-08-05-9.63, 24.30 · 84 MW · 2026-08-05-8.98, 23.81 · 84 MW · 2026-08-05-8.98, 23.82 · 84 MW · 2026-08-05-9.52, 24.11 · 84 MW · 2026-08-05-10.88, 19.40 · 84 MW · 2026-08-05-7.25, 28.69 · 84 MW · 2026-08-05-4.28, 18.22 · 84 MW · 2026-08-05-8.55, 25.38 · 84 MW · 2026-08-05-8.51, 22.52 · 84 MW · 2026-08-05-8.50, 22.52 · 84 MW · 2026-08-05-7.05, 14.58 · 84 MW · 2026-08-05-9.72, 19.81 · 84 MW · 2026-08-05-9.71, 19.81 · 84 MW · 2026-08-05-3.85, 13.04 · 84 MW · 2026-08-05-8.62, 23.18 · 83 MW · 2026-08-05-8.97, 24.73 · 83 MW · 2026-08-05-8.97, 24.74 · 83 MW · 2026-08-05-11.67, 131.16 · 83 MW · 2026-08-05-9.18, 19.20 · 83 MW · 2026-08-05-10.46, 22.14 · 83 MW · 2026-08-05-10.46, 22.15 · 83 MW · 2026-08-05-10.46, 22.14 · 83 MW · 2026-08-05-10.45, 22.15 · 83 MW · 2026-08-0564.98, 110.21 · 83 MW · 2026-08-0564.98, 110.21 · 83 MW · 2026-08-0564.98, 110.21 · 83 MW · 2026-08-0564.98, 110.21 · 83 MW · 2026-08-05-10.80, 22.74 · 83 MW · 2026-08-05-10.80, 22.74 · 83 MW · 2026-08-0565.86, 100.32 · 83 MW · 2026-08-0565.86, 100.32 · 83 MW · 2026-08-0565.86, 100.33 · 83 MW · 2026-08-05-13.65, 15.94 · 82 MW · 2026-08-050.07, 110.26 · 82 MW · 2026-08-05-8.63, 24.47 · 82 MW · 2026-08-05-6.58, 25.27 · 82 MW · 2026-08-05-6.58, 25.27 · 82 MW · 2026-08-05-6.57, 25.27 · 82 MW · 2026-08-05-16.78, 20.80 · 82 MW · 2026-08-05-12.76, 25.87 · 82 MW · 2026-08-05-12.75, 25.86 · 82 MW · 2026-08-0559.93, 89.74 · 82 MW · 2026-08-0559.93, 89.74 · 82 MW · 2026-08-0559.93, 89.74 · 82 MW · 2026-08-0559.93, 89.74 · 82 MW · 2026-08-05-19.10, 123.20 · 82 MW · 2026-08-05-9.92, 24.10 · 82 MW · 2026-08-05-18.64, 34.19 · 82 MW · 2026-08-05-9.31, 24.76 · 82 MW · 2026-08-05-9.30, 24.77 · 82 MW · 2026-08-05-9.30, 24.76 · 82 MW · 2026-08-05-9.30, 24.77 · 82 MW · 2026-08-05-10.42, 24.47 · 81 MW · 2026-08-05-10.41, 24.47 · 81 MW · 2026-08-05-9.24, 22.56 · 81 MW · 2026-08-05-9.24, 22.56 · 81 MW · 2026-08-05-9.62, 24.29 · 81 MW · 2026-08-05-9.62, 24.30 · 81 MW · 2026-08-05-9.62, 24.29 · 81 MW · 2026-08-05-18.82, 33.44 · 81 MW · 2026-08-0568.15, 105.99 · 81 MW · 2026-08-05-3.48, 12.51 · 81 MW · 2026-08-05-3.48, 12.51 · 81 MW · 2026-08-05-10.71, 20.84 · 81 MW · 2026-08-0565.39, 107.26 · 81 MW · 2026-08-0565.39, 107.27 · 81 MW · 2026-08-0565.39, 107.26 · 81 MW · 2026-08-0565.39, 107.27 · 81 MW · 2026-08-05-14.92, 32.57 · 81 MW · 2026-08-05-14.92, 32.57 · 81 MW · 2026-08-0568.58, 108.66 · 81 MW · 2026-08-05-14.67, 32.67 · 80 MW · 2026-08-05-14.67, 32.66 · 80 MW · 2026-08-05-6.99, 18.03 · 80 MW · 2026-08-0564.25, 108.90 · 80 MW · 2026-08-0564.25, 108.91 · 80 MW · 2026-08-05-8.75, 20.04 · 80 MW · 2026-08-05-8.75, 20.05 · 80 MW · 2026-08-057.06, -62.16 · 80 MW · 2026-08-057.06, -62.16 · 80 MW · 2026-08-0564.22, 115.08 · 80 MW · 2026-08-0564.23, 115.07 · 80 MW · 2026-08-0551.20, -122.77 · 80 MW · 2026-08-05-13.77, 19.32 · 80 MW · 2026-08-05-13.76, 19.32 · 80 MW · 2026-08-0568.11, 83.50 · 80 MW · 2026-08-05-9.24, 22.57 · 80 MW · 2026-08-0538.75, -112.23 · 80 MW · 2026-08-05-7.04, 26.98 · 80 MW · 2026-08-0564.27, 107.02 · 80 MW · 2026-08-0564.27, 107.02 · 80 MW · 2026-08-05-10.26, 20.20 · 79 MW · 2026-08-0568.10, 83.54 · 79 MW · 2026-08-0568.10, 83.55 · 79 MW · 2026-08-0568.11, 83.54 · 79 MW · 2026-08-0568.11, 83.54 · 79 MW · 2026-08-05-9.31, 24.76 · 79 MW · 2026-08-05-9.30, 24.75 · 79 MW · 2026-08-0559.32, 90.99 · 79 MW · 2026-08-05-18.28, 33.60 · 79 MW · 2026-08-05-9.63, 24.29 · 79 MW · 2026-08-0564.34, 97.38 · 79 MW · 2026-08-0564.34, 97.39 · 79 MW · 2026-08-0564.34, 97.38 · 79 MW · 2026-08-0564.34, 97.39 · 79 MW · 2026-08-0551.35, -122.05 · 79 MW · 2026-08-0551.35, -122.05 · 79 MW · 2026-08-0551.36, -122.06 · 79 MW · 2026-08-0551.36, -122.05 · 79 MW · 2026-08-0565.86, 100.32 · 79 MW · 2026-08-0565.86, 100.31 · 79 MW · 2026-08-0565.86, 100.32 · 79 MW · 2026-08-0568.14, 105.99 · 79 MW · 2026-08-0568.15, 105.98 · 79 MW · 2026-08-0551.26, -121.89 · 79 MW · 2026-08-0551.26, -121.89 · 79 MW · 2026-08-0551.27, -121.90 · 79 MW · 2026-08-0551.27, -121.89 · 79 MW · 2026-08-05-8.80, 24.70 · 79 MW · 2026-08-0545.57, 41.63 · 79 MW · 2026-08-05-20.97, 130.89 · 79 MW · 2026-08-05-20.96, 130.90 · 79 MW · 2026-08-05-20.96, 130.89 · 79 MW · 2026-08-05-14.30, 35.84 · 79 MW · 2026-08-050.12, 110.27 · 79 MW · 2026-08-0548.04, -120.57 · 78 MW · 2026-08-0548.05, -120.58 · 78 MW · 2026-08-05-7.40, 22.26 · 78 MW · 2026-08-05-7.40, 22.27 · 78 MW · 2026-08-0564.33, 97.37 · 78 MW · 2026-08-0564.34, 97.36 · 78 MW · 2026-08-0564.34, 97.37 · 78 MW · 2026-08-05-10.16, 19.52 · 78 MW · 2026-08-05-10.15, 19.52 · 78 MW · 2026-08-05-8.98, 18.86 · 78 MW · 2026-08-05-8.98, 18.86 · 78 MW · 2026-08-05-8.97, 18.86 · 78 MW · 2026-08-05-9.05, 22.75 · 78 MW · 2026-08-05-9.05, 22.75 · 78 MW · 2026-08-05-9.04, 22.75 · 78 MW · 2026-08-0567.88, 101.96 · 78 MW · 2026-08-0567.89, 101.96 · 78 MW · 2026-08-05-8.63, 20.24 · 78 MW · 2026-08-05-8.62, 20.24 · 78 MW · 2026-08-05-8.59, 18.84 · 78 MW · 2026-08-05-0.43, 110.83 · 78 MW · 2026-08-05-0.43, 110.83 · 78 MW · 2026-08-05-5.10, 14.53 · 78 MW · 2026-08-05-20.06, 44.72 · 78 MW · 2026-08-05-18.49, 34.38 · 78 MW · 2026-08-05-9.93, 21.07 · 78 MW · 2026-08-05-9.53, 18.54 · 78 MW · 2026-08-05-9.53, 18.54 · 78 MW · 2026-08-05-11.22, 16.96 · 78 MW · 2026-08-05-7.39, 15.84 · 77 MW · 2026-08-05-8.52, 17.35 · 77 MW · 2026-08-05-8.52, 17.36 · 77 MW · 2026-08-05-8.51, 17.35 · 77 MW · 2026-08-05-8.51, 17.36 · 77 MW · 2026-08-05-8.52, 17.34 · 77 MW · 2026-08-05-8.52, 17.35 · 77 MW · 2026-08-05-8.51, 17.35 · 77 MW · 2026-08-05-17.88, 34.52 · 77 MW · 2026-08-0546.50, 32.79 · 77 MW · 2026-08-0546.51, 32.78 · 77 MW · 2026-08-05-15.45, 15.17 · 77 MW · 2026-08-05-15.45, 15.17 · 77 MW · 2026-08-0568.61, 109.30 · 77 MW · 2026-08-0568.61, 109.31 · 77 MW · 2026-08-05-17.09, 29.97 · 77 MW · 2026-08-0568.22, 83.66 · 77 MW · 2026-08-05-6.92, 24.45 · 77 MW · 2026-08-05-6.91, 24.45 · 77 MW · 2026-08-0565.75, 115.06 · 77 MW · 2026-08-05-4.46, 16.00 · 77 MW · 2026-08-05-4.46, 16.00 · 77 MW · 2026-08-0560.43, 96.51 · 77 MW · 2026-08-05-2.06, 112.82 · 77 MW · 2026-08-05-8.97, 24.75 · 76 MW · 2026-08-05-8.97, 24.75 · 76 MW · 2026-08-05-8.97, 24.75 · 76 MW · 2026-08-05-8.97, 24.75 · 76 MW · 2026-08-0564.34, 97.44 · 76 MW · 2026-08-0564.34, 97.42 · 76 MW · 2026-08-0559.41, 89.41 · 76 MW · 2026-08-0559.41, 89.42 · 76 MW · 2026-08-0559.41, 89.42 · 76 MW · 2026-08-0568.26, 106.39 · 76 MW · 2026-08-0548.86, -119.77 · 76 MW · 2026-08-0548.86, -119.78 · 76 MW · 2026-08-0548.86, -119.77 · 76 MW · 2026-08-05-10.20, 22.75 · 76 MW · 2026-08-05-10.20, 22.75 · 76 MW · 2026-08-05-10.30, 16.47 · 76 MW · 2026-08-0545.29, -121.59 · 76 MW · 2026-08-05-10.46, 22.15 · 76 MW · 2026-08-05-10.46, 22.16 · 76 MW · 2026-08-05-10.45, 22.15 · 76 MW · 2026-08-05-10.45, 22.16 · 76 MW · 2026-08-05-3.73, 12.74 · 76 MW · 2026-08-05-6.84, 14.64 · 76 MW · 2026-08-0538.70, -112.30 · 76 MW · 2026-08-0538.70, -112.31 · 76 MW · 2026-08-05-15.15, 47.84 · 76 MW · 2026-08-05-15.15, 47.85 · 76 MW · 2026-08-0545.32, -121.55 · 76 MW · 2026-08-0545.33, -121.56 · 76 MW · 2026-08-0545.33, -121.55 · 76 MW · 2026-08-0545.33, -121.56 · 76 MW · 2026-08-05-10.54, 21.02 · 76 MW · 2026-08-05-10.54, 21.02 · 76 MW · 2026-08-05-8.25, 25.66 · 76 MW · 2026-08-05-8.25, 25.66 · 76 MW · 2026-08-0559.67, 90.32 · 76 MW · 2026-08-05-8.96, 25.72 · 76 MW · 2026-08-05-8.95, 25.72 · 76 MW · 2026-08-05-12.76, 25.87 · 76 MW · 2026-08-05-12.75, 25.87 · 76 MW · 2026-08-05-13.07, 15.97 · 75 MW · 2026-08-05-4.80, 18.72 · 75 MW · 2026-08-05-12.94, 30.05 · 75 MW · 2026-08-05-16.25, 19.25 · 75 MW · 2026-08-05-7.87, 20.90 · 75 MW · 2026-08-05-7.87, 20.90 · 75 MW · 2026-08-05-7.87, 20.90 · 75 MW · 2026-08-05-7.87, 20.90 · 75 MW · 2026-08-0564.05, 114.74 · 75 MW · 2026-08-0564.05, 114.75 · 75 MW · 2026-08-05-9.27, 19.98 · 75 MW · 2026-08-05-9.27, 19.98 · 75 MW · 2026-08-05-7.88, 20.90 · 75 MW · 2026-08-05-7.88, 20.90 · 75 MW · 2026-08-05-10.31, 21.18 · 75 MW · 2026-08-05-10.30, 21.18 · 75 MW · 2026-08-05-9.90, 29.45 · 74 MW · 2026-08-05-9.90, 29.45 · 74 MW · 2026-08-0541.70, 15.53 · 74 MW · 2026-08-0541.70, 15.54 · 74 MW · 2026-08-0541.71, 15.53 · 74 MW · 2026-08-0541.71, 15.54 · 74 MW · 2026-08-05-5.64, 26.45 · 74 MW · 2026-08-05-5.64, 26.46 · 74 MW · 2026-08-05-5.63, 26.45 · 74 MW · 2026-08-05-7.05, 26.99 · 74 MW · 2026-08-05-7.04, 26.99 · 74 MW · 2026-08-05-7.04, 26.99 · 74 MW · 2026-08-0565.14, 105.75 · 74 MW · 2026-08-0565.14, 105.76 · 74 MW · 2026-08-0565.14, 105.74 · 74 MW · 2026-08-0565.14, 105.76 · 74 MW · 2026-08-05-10.81, 22.75 · 74 MW · 2026-08-05-10.81, 22.75 · 74 MW · 2026-08-05-10.81, 22.74 · 74 MW · 2026-08-05-10.81, 22.75 · 74 MW · 2026-08-05-17.62, 21.58 · 74 MW · 2026-08-05-9.33, 24.87 · 74 MW · 2026-08-05-9.33, 24.87 · 74 MW · 2026-08-05-9.32, 24.87 · 74 MW · 2026-08-05-9.70, 21.82 · 74 MW · 2026-08-05-9.69, 21.82 · 74 MW · 2026-08-05-17.48, 33.23 · 74 MW · 2026-08-05-17.48, 33.23 · 74 MW · 2026-08-05-8.53, 17.35 · 74 MW · 2026-08-05-8.53, 17.35 · 74 MW · 2026-08-05-8.52, 17.35 · 74 MW · 2026-08-05-8.52, 17.35 · 74 MW · 2026-08-05-8.07, 24.94 · 74 MW · 2026-08-05-8.07, 24.95 · 74 MW · 2026-08-05-8.06, 24.94 · 74 MW · 2026-08-05-8.06, 24.95 · 74 MW · 2026-08-05-14.50, 20.07 · 74 MW · 2026-08-05-14.50, 20.07 · 74 MW · 2026-08-0551.31, -122.00 · 73 MW · 2026-08-0551.31, -121.99 · 73 MW · 2026-08-0551.32, -122.00 · 73 MW · 2026-08-0551.32, -122.00 · 73 MW · 2026-08-05-8.04, 20.77 · 73 MW · 2026-08-05-2.90, 14.55 · 73 MW · 2026-08-05-12.49, 132.65 · 73 MW · 2026-08-05-5.69, 14.50 · 73 MW · 2026-08-05-5.69, 14.49 · 73 MW · 2026-08-0564.72, 109.73 · 73 MW · 2026-08-0564.72, 109.73 · 73 MW · 2026-08-0568.35, 102.29 · 73 MW · 2026-08-0568.38, 106.80 · 73 MW · 2026-08-0568.38, 106.81 · 73 MW · 2026-08-0568.38, 106.80 · 73 MW · 2026-08-0568.39, 106.80 · 73 MW · 2026-08-050.22, 111.02 · 73 MW · 2026-08-0564.33, 107.14 · 73 MW · 2026-08-0564.33, 107.13 · 73 MW · 2026-08-05-10.61, 21.44 · 73 MW · 2026-08-05-10.61, 21.45 · 73 MW · 2026-08-05-10.60, 21.44 · 73 MW · 2026-08-05-10.60, 21.45 · 73 MW · 2026-08-05-9.05, 16.48 · 73 MW · 2026-08-0564.33, 107.15 · 72 MW · 2026-08-05-6.11, 29.99 · 72 MW · 2026-08-0511.29, 41.52 · 72 MW · 2026-08-0511.29, 41.52 · 72 MW · 2026-08-0548.87, -120.62 · 72 MW · 2026-08-0548.88, -120.63 · 72 MW · 2026-08-0538.13, -120.76 · 72 MW · 2026-08-0538.13, -120.76 · 72 MW · 2026-08-0538.13, -120.75 · 72 MW · 2026-08-0538.13, -120.76 · 72 MW · 2026-08-05-10.26, 20.20 · 72 MW · 2026-08-05-9.29, 24.76 · 72 MW · 2026-08-05-9.29, 24.76 · 72 MW · 2026-08-05-9.29, 24.76 · 72 MW · 2026-08-05-9.28, 24.76 · 72 MW · 2026-08-05-8.70, 19.41 · 72 MW · 2026-08-05-8.69, 19.41 · 72 MW · 2026-08-05-8.69, 19.41 · 72 MW · 2026-08-05-8.69, 19.41 · 72 MW · 2026-08-0535.98, 43.39 · 72 MW · 2026-08-0535.98, 43.39 · 72 MW · 2026-08-05-3.86, 12.54 · 72 MW · 2026-08-0536.99, 42.17 · 72 MW · 2026-08-0536.99, 42.18 · 72 MW · 2026-08-05-11.00, 17.91 · 72 MW · 2026-08-050.90, 111.69 · 72 MW · 2026-08-0544.42, -120.53 · 72 MW · 2026-08-0544.42, -120.53 · 72 MW · 2026-08-0544.42, -120.53 · 72 MW · 2026-08-05-12.72, 21.47 · 72 MW · 2026-08-05-2.55, 110.66 · 72 MW · 2026-08-05-3.61, 18.02 · 72 MW · 2026-08-05-3.61, 18.02 · 72 MW · 2026-08-05-3.60, 18.02 · 72 MW · 2026-08-0568.78, 107.81 · 72 MW · 2026-08-0568.78, 107.80 · 72 MW · 2026-08-0568.78, 107.81 · 72 MW · 2026-08-05-15.44, 15.17 · 72 MW · 2026-08-05-15.44, 15.18 · 72 MW · 2026-08-05-15.44, 15.17 · 72 MW · 2026-08-0565.16, 105.71 · 72 MW · 2026-08-0565.16, 105.72 · 72 MW · 2026-08-0565.17, 105.72 · 72 MW · 2026-08-05-7.06, 26.73 · 72 MW · 2026-08-05-7.06, 26.74 · 72 MW · 2026-08-0564.38, 115.68 · 72 MW · 2026-08-0564.38, 115.67 · 72 MW · 2026-08-0564.39, 115.68 · 72 MW · 2026-08-0564.39, 115.67 · 72 MW · 2026-08-05-7.58, 25.71 · 71 MW · 2026-08-0565.18, 97.96 · 71 MW · 2026-08-0565.18, 97.97 · 71 MW · 2026-08-0567.95, 84.02 · 71 MW · 2026-08-0567.95, 84.03 · 71 MW · 2026-08-0567.96, 84.02 · 71 MW · 2026-08-05-10.36, 19.64 · 71 MW · 2026-08-05-10.35, 19.64 · 71 MW · 2026-08-05-10.35, 19.64 · 71 MW · 2026-08-05-17.62, 21.60 · 71 MW · 2026-08-05-14.29, 38.59 · 71 MW · 2026-08-0564.33, 97.39 · 71 MW · 2026-08-0564.33, 97.40 · 71 MW · 2026-08-0564.34, 97.39 · 71 MW · 2026-08-0564.34, 97.40 · 71 MW · 2026-08-0568.38, 106.84 · 71 MW · 2026-08-0559.81, 89.69 · 71 MW · 2026-08-0559.81, 89.68 · 71 MW · 2026-08-0559.81, 89.68 · 71 MW · 2026-08-05-16.16, 21.76 · 71 MW · 2026-08-05-16.15, 21.75 · 71 MW · 2026-08-05-16.15, 21.76 · 71 MW · 2026-08-05-13.65, 30.74 · 71 MW · 2026-08-05-10.84, 15.90 · 71 MW · 2026-08-05-4.65, 18.76 · 71 MW · 2026-08-05-14.36, 39.21 · 71 MW · 2026-08-05-5.68, 31.60 · 71 MW · 2026-08-0547.54, 31.20 · 71 MW · 2026-08-050.85, 111.68 · 71 MW · 2026-08-0528.92, 9.75 · 71 MW · 2026-08-0544.46, -120.53 · 71 MW · 2026-08-05-8.63, 20.24 · 71 MW · 2026-08-05-8.62, 20.24 · 71 MW · 2026-08-05-8.62, 20.24 · 71 MW · 2026-08-0565.00, 110.14 · 71 MW · 2026-08-0565.00, 110.14 · 71 MW · 2026-08-05-0.57, 110.27 · 70 MW · 2026-08-0547.49, -118.20 · 70 MW · 2026-08-05-9.24, 22.57 · 70 MW · 2026-08-0565.31, 107.31 · 70 MW · 2026-08-0565.31, 107.32 · 70 MW · 2026-08-05-10.81, 22.74 · 70 MW · 2026-08-05-10.81, 22.74 · 70 MW · 2026-08-05-5.86, 15.27 · 70 MW · 2026-08-05-18.07, 34.30 · 70 MW · 2026-08-0559.92, 89.70 · 70 MW · 2026-08-0559.92, 89.70 · 70 MW · 2026-08-0538.70, -112.30 · 70 MW · 2026-08-0544.38, -119.74 · 70 MW · 2026-08-0544.38, -119.73 · 70 MW · 2026-08-05-10.51, 21.08 · 70 MW · 2026-08-05-10.51, 21.08 · 70 MW · 2026-08-05-10.50, 21.08 · 70 MW · 2026-08-05-10.50, 21.08 · 70 MW · 2026-08-05-10.10, 15.76 · 70 MW · 2026-08-0564.74, 110.42 · 70 MW · 2026-08-0564.74, 110.43 · 70 MW · 2026-08-05-4.48, 13.48 · 70 MW · 2026-08-0564.06, 114.74 · 70 MW · 2026-08-0564.06, 114.74 · 70 MW · 2026-08-05-10.33, 20.08 · 70 MW · 2026-08-0547.95, -120.58 · 70 MW · 2026-08-0547.96, -120.58 · 70 MW · 2026-08-0547.96, -120.58 · 70 MW · 2026-08-0547.96, -120.58 · 70 MW · 2026-08-05-5.76, 16.42 · 70 MW · 2026-08-05-5.75, 16.42 · 70 MW · 2026-08-05-5.75, 16.42 · 70 MW · 2026-08-05-4.43, 19.18 · 70 MW · 2026-08-05-15.86, 25.47 · 70 MW · 2026-08-05-15.86, 25.47 · 70 MW · 2026-08-0564.37, 106.90 · 70 MW · 2026-08-0564.37, 106.91 · 70 MW · 2026-08-0564.37, 106.91 · 70 MW · 2026-08-0563.53, 80.71 · 70 MW · 2026-08-0563.53, 80.73 · 70 MW · 2026-08-05-7.39, 15.84 · 70 MW · 2026-08-0568.40, 83.69 · 70 MW · 2026-08-0568.40, 83.68 · 70 MW · 2026-08-0564.55, 106.75 · 70 MW · 2026-08-0564.56, 106.75 · 70 MW · 2026-08-0559.42, 89.42 · 70 MW · 2026-08-0562.41, 82.16 · 70 MW · 2026-08-05-8.64, 20.24 · 69 MW · 2026-08-05-8.63, 20.24 · 69 MW · 2026-08-05-9.94, 21.07 · 69 MW · 2026-08-05-9.93, 21.07 · 69 MW · 2026-08-0564.33, 97.37 · 69 MW · 2026-08-0564.33, 97.38 · 69 MW · 2026-08-0564.34, 97.37 · 69 MW · 2026-08-0564.34, 97.38 · 69 MW · 2026-08-05-10.55, 16.69 · 69 MW · 2026-08-05-15.33, 31.52 · 69 MW · 2026-08-05-10.35, 20.20 · 69 MW · 2026-08-05-10.34, 20.21 · 69 MW · 2026-08-05-10.04, 15.61 · 69 MW · 2026-08-05-10.04, 15.61 · 69 MW · 2026-08-0559.67, 88.21 · 69 MW · 2026-08-05-9.31, 24.89 · 69 MW · 2026-08-05-9.90, 29.44 · 69 MW · 2026-08-05-8.53, 25.60 · 69 MW · 2026-08-05-8.11, 23.45 · 69 MW · 2026-08-0568.14, 106.02 · 69 MW · 2026-08-0568.14, 106.04 · 69 MW · 2026-08-05-10.32, 21.18 · 69 MW · 2026-08-0547.27, 34.45 · 69 MW · 2026-08-05-26.65, 27.28 · 69 MW · 2026-08-05-8.10, 24.98 · 69 MW · 2026-08-05-3.90, 12.61 · 69 MW · 2026-08-0545.87, -92.67 · 69 MW · 2026-08-0545.87, -92.66 · 69 MW · 2026-08-0545.87, -92.66 · 69 MW · 2026-08-05-3.85, 12.55 · 69 MW · 2026-08-05-18.73, 34.67 · 69 MW · 2026-08-05-8.96, 24.73 · 69 MW · 2026-08-05-8.96, 24.74 · 69 MW · 2026-08-05-8.96, 24.73 · 69 MW · 2026-08-05-8.96, 24.74 · 69 MW · 2026-08-05-7.46, 139.23 · 69 MW · 2026-08-05-10.62, 26.70 · 68 MW · 2026-08-05-10.62, 26.70 · 68 MW · 2026-08-05-10.61, 26.70 · 68 MW · 2026-08-05-9.97, 16.68 · 68 MW · 2026-08-05-9.97, 16.68 · 68 MW · 2026-08-05-9.96, 16.68 · 68 MW · 2026-08-05-26.99, 24.85 · 68 MW · 2026-08-05-10.45, 19.38 · 68 MW · 2026-08-0563.21, 109.82 · 68 MW · 2026-08-0564.49, 100.88 · 68 MW · 2026-08-0564.49, 100.89 · 68 MW · 2026-08-05-9.83, 21.14 · 68 MW · 2026-08-05-9.82, 21.14 · 68 MW · 2026-08-05-29.68, 29.34 · 68 MW · 2026-08-05-29.68, 29.34 · 68 MW · 2026-08-05-20.01, 29.01 · 68 MW · 2026-08-05-20.01, 29.01 · 68 MW · 2026-08-05-20.01, 29.02 · 68 MW · 2026-08-05-26.28, 28.72 · 68 MW · 2026-08-05-26.28, 28.72 · 68 MW · 2026-08-0564.02, 112.34 · 68 MW · 2026-08-0564.02, 112.34 · 68 MW · 2026-08-05-8.36, 24.91 · 68 MW · 2026-08-05-8.36, 24.91 · 68 MW · 2026-08-05-10.17, 20.49 · 68 MW · 2026-08-05-10.17, 20.49 · 68 MW · 2026-08-05-9.80, 21.80 · 68 MW · 2026-08-05-9.79, 21.80 · 68 MW · 2026-08-05-9.79, 21.80 · 68 MW · 2026-08-05-9.79, 21.80 · 68 MW · 2026-08-05-10.71, 16.00 · 68 MW · 2026-08-05-7.63, 26.13 · 68 MW · 2026-08-05-9.08, 21.61 · 68 MW · 2026-08-0564.72, 91.68 · 68 MW · 2026-08-0511.29, 41.52 · 68 MW · 2026-08-0511.29, 41.52 · 68 MW · 2026-08-05-11.45, 16.10 · 68 MW · 2026-08-05-11.45, 16.11 · 68 MW · 2026-08-05-11.45, 16.10 · 68 MW · 2026-08-05-11.45, 16.11 · 68 MW · 2026-08-05-20.96, 130.90 · 68 MW · 2026-08-0545.31, -121.58 · 68 MW · 2026-08-0545.31, -121.58 · 68 MW · 2026-08-0545.31, -121.58 · 68 MW · 2026-08-0545.31, -121.58 · 68 MW · 2026-08-05-7.89, 26.06 · 67 MW · 2026-08-0566.15, 118.18 · 67 MW · 2026-08-0566.15, 118.16 · 67 MW · 2026-08-0566.16, 118.16 · 67 MW · 2026-08-05-8.79, 18.77 · 67 MW · 2026-08-05-8.79, 18.77 · 67 MW · 2026-08-0564.02, 112.36 · 67 MW · 2026-08-0564.02, 112.35 · 67 MW · 2026-08-0564.02, 112.36 · 67 MW · 2026-08-0564.02, 112.35 · 67 MW · 2026-08-05-18.49, 47.48 · 67 MW · 2026-08-0551.27, -122.49 · 67 MW · 2026-08-05-25.98, 30.47 · 67 MW · 2026-08-05-20.01, 29.00 · 67 MW · 2026-08-05-20.01, 29.01 · 67 MW · 2026-08-05-20.01, 29.00 · 67 MW · 2026-08-05-20.00, 29.01 · 67 MW · 2026-08-0551.27, -121.93 · 67 MW · 2026-08-0551.28, -121.92 · 67 MW · 2026-08-05-17.70, 20.68 · 67 MW · 2026-08-05-1.96, -47.75 · 67 MW · 2026-08-05-27.41, 26.71 · 67 MW · 2026-08-05-27.41, 26.71 · 67 MW · 2026-08-05-19.14, 123.15 · 67 MW · 2026-08-05-19.13, 123.14 · 67 MW · 2026-08-05-19.13, 123.14 · 67 MW · 2026-08-05-6.92, 24.44 · 67 MW · 2026-08-05-6.92, 24.45 · 67 MW · 2026-08-05-6.92, 24.44 · 67 MW · 2026-08-05-6.92, 24.45 · 67 MW · 2026-08-05-6.50, 28.13 · 67 MW · 2026-08-05-6.43, 17.64 · 67 MW · 2026-08-05-6.11, 29.99 · 67 MW · 2026-08-0538.96, -112.20 · 67 MW · 2026-08-0564.33, 97.38 · 67 MW · 2026-08-0564.33, 97.40 · 67 MW · 2026-08-0564.33, 97.38 · 67 MW · 2026-08-0564.33, 97.39 · 67 MW · 2026-08-0565.31, 107.33 · 67 MW · 2026-08-0565.31, 107.33 · 67 MW · 2026-08-05-17.15, 31.28 · 67 MW · 2026-08-05-3.45, 17.99 · 67 MW · 2026-08-05-3.44, 17.99 · 67 MW · 2026-08-05-12.80, 26.19 · 67 MW · 2026-08-05-12.80, 26.19 · 67 MW · 2026-08-0565.77, 99.79 · 67 MW · 2026-08-0565.77, 99.80 · 67 MW · 2026-08-0565.77, 99.78 · 67 MW · 2026-08-0565.77, 99.79 · 67 MW · 2026-08-05-10.20, 20.51 · 67 MW · 2026-08-05-10.20, 20.51 · 67 MW · 2026-08-0565.44, 107.85 · 67 MW · 2026-08-0565.44, 107.86 · 67 MW · 2026-08-05-19.91, 33.97 · 67 MW · 2026-08-05-19.90, 33.97 · 67 MW · 2026-08-05-19.90, 33.97 · 67 MW · 2026-08-0538.96, -112.19 · 67 MW · 2026-08-05-10.48, 22.14 · 66 MW · 2026-08-05-10.48, 22.14 · 66 MW · 2026-08-05-10.48, 22.14 · 66 MW · 2026-08-05-18.64, 34.19 · 66 MW · 2026-08-05-18.63, 34.19 · 66 MW · 2026-08-05-3.91, 30.74 · 66 MW · 2026-08-05-15.98, 37.56 · 66 MW · 2026-08-05-7.58, 25.70 · 66 MW · 2026-08-05-7.57, 25.70 · 66 MW · 2026-08-05-12.29, 20.04 · 66 MW · 2026-08-05-12.28, 20.04 · 66 MW · 2026-08-05-14.33, 27.20 · 66 MW · 2026-08-05-14.33, 27.21 · 66 MW · 2026-08-05-6.75, 15.26 · 66 MW · 2026-08-05-16.27, 39.46 · 66 MW · 2026-08-0564.36, 115.79 · 66 MW · 2026-08-0564.37, 115.79 · 66 MW · 2026-08-0544.47, -120.57 · 66 MW · 2026-08-0544.48, -120.56 · 66 MW · 2026-08-0544.48, -120.57 · 66 MW · 2026-08-0544.48, -120.56 · 66 MW · 2026-08-05-26.98, 24.86 · 66 MW · 2026-08-05-26.98, 24.86 · 66 MW · 2026-08-05-26.98, 24.86 · 66 MW · 2026-08-05-17.80, 20.71 · 66 MW · 2026-08-05-29.26, 26.31 · 66 MW · 2026-08-05-29.26, 26.31 · 66 MW · 2026-08-05-11.68, 24.47 · 66 MW · 2026-08-05-11.68, 24.47 · 66 MW · 2026-08-05-12.36, 30.27 · 66 MW · 2026-08-05-12.36, 30.27 · 66 MW · 2026-08-0545.37, -121.54 · 66 MW · 2026-08-0545.37, -121.55 · 66 MW · 2026-08-0545.37, -121.54 · 66 MW · 2026-08-0545.38, -121.54 · 66 MW · 2026-08-05-13.09, 21.68 · 66 MW · 2026-08-05-13.08, 21.68 · 66 MW · 2026-08-05-8.98, 22.74 · 66 MW · 2026-08-05-8.97, 22.74 · 66 MW · 2026-08-05-7.90, 26.07 · 66 MW · 2026-08-05-8.61, 23.19 · 66 MW · 2026-08-0559.48, 88.50 · 66 MW · 2026-08-0559.48, 88.51 · 66 MW · 2026-08-0559.48, 88.50 · 66 MW · 2026-08-0559.48, 88.50 · 66 MW · 2026-08-05-11.80, -75.50 · 66 MW · 2026-08-05-10.72, 15.90 · 66 MW · 2026-08-05-12.83, 37.42 · 66 MW · 2026-08-05-12.83, 37.43 · 66 MW · 2026-08-0548.09, 35.89 · 66 MW · 2026-08-0548.09, 35.90 · 66 MW · 2026-08-0548.10, 35.89 · 66 MW · 2026-08-0548.10, 35.90 · 66 MW · 2026-08-0538.68, -112.45 · 66 MW · 2026-08-0538.69, -112.45 · 66 MW · 2026-08-0538.69, -112.46 · 66 MW · 2026-08-0538.69, -112.45 · 66 MW · 2026-08-051.29, 116.78 · 66 MW · 2026-08-05-8.50, 22.51 · 65 MW · 2026-08-0565.01, 110.08 · 65 MW · 2026-08-0544.46, -120.55 · 65 MW · 2026-08-0544.47, -120.56 · 65 MW · 2026-08-0544.47, -120.56 · 65 MW · 2026-08-05-16.34, -49.99 · 65 MW · 2026-08-0564.35, 115.81 · 65 MW · 2026-08-0564.35, 115.82 · 65 MW · 2026-08-0564.35, 115.81 · 65 MW · 2026-08-0564.36, 115.82 · 65 MW · 2026-08-0551.26, -122.50 · 65 MW · 2026-08-0551.27, -122.50 · 65 MW · 2026-08-05-6.27, 32.46 · 65 MW · 2026-08-05-9.31, 24.88 · 65 MW · 2026-08-05-9.31, 24.88 · 65 MW · 2026-08-05-9.30, 24.88 · 65 MW · 2026-08-05-9.30, 24.88 · 65 MW · 2026-08-0542.41, -116.85 · 65 MW · 2026-08-0542.41, -116.84 · 65 MW · 2026-08-05-9.22, 19.17 · 65 MW · 2026-08-05-10.82, 15.89 · 65 MW · 2026-08-05-14.11, 38.61 · 65 MW · 2026-08-0538.98, 39.48 · 65 MW · 2026-08-0564.34, 115.82 · 65 MW · 2026-08-0564.34, 115.81 · 65 MW · 2026-08-0564.34, 115.82 · 65 MW · 2026-08-05-15.17, 47.45 · 65 MW · 2026-08-05-15.17, 47.45 · 65 MW · 2026-08-05-15.17, 47.45 · 65 MW · 2026-08-05-8.47, 38.34 · 65 MW · 2026-08-05-5.86, 18.53 · 65 MW · 2026-08-05-29.68, 29.35 · 65 MW · 2026-08-0538.94, -112.26 · 65 MW · 2026-08-05-0.18, 109.38 · 65 MW · 2026-08-05-12.41, 21.35 · 65 MW · 2026-08-05-12.40, 21.35 · 65 MW · 2026-08-05-6.10, 29.99 · 65 MW · 2026-08-0564.73, 91.74 · 65 MW · 2026-08-05-8.47, 146.42 · 65 MW · 2026-08-05-6.92, 21.06 · 65 MW · 2026-08-05-6.92, 21.07 · 65 MW · 2026-08-05-8.51, 22.51 · 65 MW · 2026-08-05-8.50, 22.51 · 65 MW · 2026-08-05-14.19, 39.65 · 65 MW · 2026-08-05-16.78, 20.80 · 65 MW · 2026-08-05-7.64, 26.15 · 65 MW · 2026-08-0559.60, 87.86 · 64 MW · 2026-08-05-14.80, 37.17 · 64 MW · 2026-08-0544.41, -120.54 · 64 MW · 2026-08-0544.41, -120.53 · 64 MW · 2026-08-05-15.72, 25.78 · 64 MW · 2026-08-0559.31, 90.99 · 64 MW · 2026-08-0559.31, 91.00 · 64 MW · 2026-08-0559.31, 90.99 · 64 MW · 2026-08-0559.32, 90.99 · 64 MW · 2026-08-0565.38, 107.35 · 64 MW · 2026-08-0565.38, 107.36 · 64 MW · 2026-08-0565.38, 107.35 · 64 MW · 2026-08-0565.38, 107.36 · 64 MW · 2026-08-05-10.51, 21.09 · 64 MW · 2026-08-05-10.50, 21.09 · 64 MW · 2026-08-05-10.50, 21.09 · 64 MW · 2026-08-05-10.50, 21.09 · 64 MW · 2026-08-0563.98, 112.52 · 64 MW · 2026-08-05-12.51, 26.23 · 64 MW · 2026-08-0565.37, 107.37 · 64 MW · 2026-08-0565.37, 107.37 · 64 MW · 2026-08-0565.37, 107.36 · 64 MW · 2026-08-05-6.07, 12.74 · 64 MW · 2026-08-05-9.32, 27.07 · 64 MW · 2026-08-05-10.31, 22.90 · 64 MW · 2026-08-05-10.31, 22.90 · 64 MW · 2026-08-05-10.30, 22.90 · 64 MW · 2026-08-05-10.30, 22.90 · 64 MW · 2026-08-0568.77, 107.79 · 64 MW · 2026-08-0568.78, 107.80 · 64 MW · 2026-08-0568.78, 107.78 · 64 MW · 2026-08-0568.78, 107.79 · 64 MW · 2026-08-05-10.61, 21.45 · 64 MW · 2026-08-05-10.61, 21.45 · 64 MW · 2026-08-05-10.61, 21.45 · 64 MW · 2026-08-05-9.88, 17.13 · 64 MW · 2026-08-05-15.68, 33.69 · 64 MW · 2026-08-0566.20, 95.30 · 64 MW · 2026-08-0565.19, 97.96 · 64 MW · 2026-08-0565.19, 97.96 · 64 MW · 2026-08-0565.19, 97.95 · 64 MW · 2026-08-0565.19, 97.96 · 64 MW · 2026-08-05-15.35, 20.18 · 64 MW · 2026-08-05-5.24, 14.03 · 64 MW · 2026-08-0564.34, 97.37 · 64 MW · 2026-08-0564.34, 97.38 · 64 MW · 2026-08-0564.34, 97.37 · 64 MW · 2026-08-0564.34, 97.38 · 64 MW · 2026-08-05-20.98, 130.92 · 64 MW · 2026-08-05-19.84, -48.84 · 64 MW · 2026-08-05-19.84, -48.83 · 64 MW · 2026-08-05-7.58, 23.09 · 64 MW · 2026-08-0559.41, 89.43 · 64 MW · 2026-08-0559.41, 89.43 · 64 MW · 2026-08-0559.42, 89.43 · 64 MW · 2026-08-05-15.70, 14.41 · 64 MW · 2026-08-05-15.69, 14.41 · 64 MW · 2026-08-05-15.69, 14.41 · 64 MW · 2026-08-05-10.87, 30.26 · 64 MW · 2026-08-05-10.47, 22.15 · 64 MW · 2026-08-05-10.20, 22.74 · 64 MW · 2026-08-05-6.26, 27.78 · 64 MW · 2026-08-05-7.04, 16.98 · 64 MW · 2026-08-05-8.51, 19.65 · 64 MW · 2026-08-05-8.51, 19.65 · 64 MW · 2026-08-05-8.51, 19.65 · 64 MW · 2026-08-0564.23, 114.91 · 64 MW · 2026-08-0564.24, 114.92 · 64 MW · 2026-08-0564.24, 114.91 · 64 MW · 2026-08-0564.24, 114.92 · 64 MW · 2026-08-0564.34, 97.40 · 64 MW · 2026-08-0564.35, 97.41 · 64 MW · 2026-08-0564.35, 97.39 · 64 MW · 2026-08-0564.35, 97.40 · 64 MW · 2026-08-0559.31, 90.97 · 64 MW · 2026-08-05-11.03, -74.94 · 64 MW · 2026-08-0565.16, 105.72 · 64 MW · 2026-08-0565.16, 105.73 · 64 MW · 2026-08-0565.16, 105.72 · 64 MW · 2026-08-0565.16, 105.73 · 64 MW · 2026-08-05-10.35, 19.63 · 64 MW · 2026-08-05-10.35, 19.63 · 64 MW · 2026-08-0567.55, 83.20 · 64 MW · 2026-08-0567.55, 83.21 · 64 MW · 2026-08-0567.94, 84.38 · 64 MW · 2026-08-0567.94, 84.39 · 64 MW · 2026-08-05-26.27, 150.45 · 64 MW · 2026-08-05-26.27, 150.44 · 64 MW · 2026-08-05-6.49, 28.12 · 64 MW · 2026-08-05-5.78, 14.40 · 64 MW · 2026-08-0559.93, 89.73 · 63 MW · 2026-08-0559.94, 89.74 · 63 MW · 2026-08-0559.94, 89.73 · 63 MW · 2026-08-0559.94, 89.74 · 63 MW · 2026-08-0564.26, 107.03 · 63 MW · 2026-08-0564.26, 107.04 · 63 MW · 2026-08-05-4.43, 17.86 · 63 MW · 2026-08-05-18.29, 33.61 · 63 MW · 2026-08-05-14.83, 29.55 · 63 MW · 2026-08-05-14.82, 29.55 · 63 MW · 2026-08-05-14.82, 29.55 · 63 MW · 2026-08-05-8.70, 19.41 · 63 MW · 2026-08-05-8.70, 19.42 · 63 MW · 2026-08-05-8.70, 19.41 · 63 MW · 2026-08-05-8.70, 19.41 · 63 MW · 2026-08-0551.23, -122.71 · 63 MW · 2026-08-0551.23, -122.70 · 63 MW · 2026-08-0551.24, -122.71 · 63 MW · 2026-08-0551.24, -122.71 · 63 MW · 2026-08-0545.58, 41.62 · 63 MW · 2026-08-0564.33, 97.39 · 63 MW · 2026-08-0564.33, 97.40 · 63 MW · 2026-08-0564.34, 97.39 · 63 MW · 2026-08-0564.34, 97.40 · 63 MW · 2026-08-05-15.36, 20.17 · 63 MW · 2026-08-05-11.20, 23.76 · 63 MW · 2026-08-05-9.47, 19.82 · 63 MW · 2026-08-0565.76, 99.77 · 63 MW · 2026-08-0565.76, 99.78 · 63 MW · 2026-08-0559.67, 90.32 · 63 MW · 2026-08-0559.67, 90.32 · 63 MW · 2026-08-0559.67, 90.31 · 63 MW · 2026-08-0559.68, 90.32 · 63 MW · 2026-08-0563.21, 109.88 · 63 MW · 2026-08-0563.21, 109.89 · 63 MW · 2026-08-0563.22, 109.88 · 63 MW · 2026-08-0563.22, 109.89 · 63 MW · 2026-08-05-16.62, 21.41 · 63 MW · 2026-08-05-29.05, 24.60 · 63 MW · 2026-08-0546.49, 31.80 · 63 MW · 2026-08-05-15.49, 40.02 · 63 MW · 2026-08-0568.34, 83.32 · 63 MW · 2026-08-0568.34, 83.33 · 63 MW · 2026-08-0568.35, 83.32 · 63 MW · 2026-08-0568.35, 83.33 · 63 MW · 2026-08-05-16.79, 20.79 · 63 MW · 2026-08-05-18.45, 14.03 · 63 MW · 2026-08-05-18.44, 14.03 · 63 MW · 2026-08-0534.68, -98.46 · 63 MW · 2026-08-0534.68, -98.45 · 63 MW · 2026-08-0534.68, -98.46 · 63 MW · 2026-08-0534.68, -98.45 · 63 MW · 2026-08-05-25.04, 28.50 · 63 MW · 2026-08-05-21.16, -50.25 · 63 MW · 2026-08-05-8.94, 19.15 · 63 MW · 2026-08-05-10.51, 21.08 · 63 MW · 2026-08-05-11.39, 17.87 · 63 MW · 2026-08-05-12.50, 16.70 · 63 MW · 2026-08-0565.43, 107.84 · 63 MW · 2026-08-0565.43, 107.84 · 63 MW · 2026-08-0565.43, 107.84 · 63 MW · 2026-08-0550.49, -117.17 · 63 MW · 2026-08-05-7.36, 25.92 · 63 MW · 2026-08-05-7.35, 25.92 · 63 MW · 2026-08-05-8.89, 16.79 · 63 MW · 2026-08-05-8.89, 16.80 · 63 MW · 2026-08-05-9.77, 21.80 · 63 MW · 2026-08-05-9.77, 21.81 · 63 MW · 2026-08-05-9.77, 21.80 · 63 MW · 2026-08-05-9.77, 21.81 · 63 MW · 2026-08-05-17.62, 21.58 · 63 MW · 2026-08-0564.00, 112.38 · 63 MW · 2026-08-0564.00, 112.37 · 63 MW · 2026-08-0564.01, 112.38 · 63 MW · 2026-08-0564.01, 112.37 · 63 MW · 2026-08-0565.21, 97.93 · 62 MW · 2026-08-0565.21, 97.94 · 62 MW · 2026-08-0565.22, 97.92 · 62 MW · 2026-08-05-9.10, 29.61 · 62 MW · 2026-08-05-12.64, 23.19 · 62 MW · 2026-08-05-8.14, 25.24 · 62 MW · 2026-08-05-8.14, 25.25 · 62 MW · 2026-08-05-8.59, 18.88 · 62 MW · 2026-08-05-6.18, 26.39 · 62 MW · 2026-08-05-6.17, 26.40 · 62 MW · 2026-08-05-25.50, 28.30 · 62 MW · 2026-08-0565.00, 110.15 · 62 MW · 2026-08-0565.00, 110.16 · 62 MW · 2026-08-05-6.18, 26.40 · 62 MW · 2026-08-05-6.17, 26.40 · 62 MW · 2026-08-0565.00, 110.14 · 62 MW · 2026-08-0551.31, -121.99 · 62 MW · 2026-08-0551.31, -121.98 · 62 MW · 2026-08-0551.32, -121.99 · 62 MW · 2026-08-05-9.49, 18.66 · 62 MW · 2026-08-0554.44, 37.46 · 62 MW · 2026-08-05-6.92, 24.43 · 62 MW · 2026-08-05-6.92, 24.44 · 62 MW · 2026-08-05-6.92, 24.43 · 62 MW · 2026-08-05-6.92, 24.44 · 62 MW · 2026-08-05-6.93, 21.06 · 62 MW · 2026-08-05-6.92, 21.06 · 62 MW · 2026-08-0565.30, 107.27 · 62 MW · 2026-08-0565.30, 107.28 · 62 MW · 2026-08-0565.30, 107.27 · 62 MW · 2026-08-05-8.37, 18.70 · 62 MW · 2026-08-05-8.37, 18.71 · 62 MW · 2026-08-05-8.36, 18.71 · 62 MW · 2026-08-0564.00, 112.56 · 62 MW · 2026-08-0564.00, 112.55 · 62 MW · 2026-08-0568.35, 83.57 · 62 MW · 2026-08-0566.20, 95.33 · 62 MW · 2026-08-0566.20, 95.32 · 62 MW · 2026-08-05-7.87, 22.82 · 62 MW · 2026-08-05-7.87, 22.82 · 62 MW · 2026-08-05-7.86, 22.82 · 62 MW · 2026-08-0564.36, 115.82 · 62 MW · 2026-08-0564.37, 115.81 · 62 MW · 2026-08-05-12.36, -66.75 · 61 MW · 2026-08-05-12.35, -66.75 · 61 MW · 2026-08-05-11.14, -74.41 · 61 MW · 2026-08-05-11.14, -74.40 · 61 MW · 2026-08-0561.35, 112.81 · 61 MW · 2026-08-0561.35, 112.80 · 61 MW · 2026-08-05-10.62, 26.71 · 61 MW · 2026-08-05-10.61, 26.71 · 61 MW · 2026-08-05-9.03, 23.67 · 61 MW · 2026-08-05-8.53, 25.61 · 61 MW · 2026-08-05-8.53, 25.61 · 61 MW · 2026-08-05-8.52, 25.61 · 61 MW · 2026-08-05-8.52, 25.61 · 61 MW · 2026-08-0552.16, 4.36 · 61 MW · 2026-08-0568.25, 107.43 · 61 MW · 2026-08-0568.25, 107.44 · 61 MW · 2026-08-0568.26, 107.43 · 61 MW · 2026-08-05-6.52, 12.96 · 61 MW · 2026-08-05-6.52, 12.95 · 61 MW · 2026-08-05-6.52, 12.96 · 61 MW · 2026-08-05-17.88, 34.52 · 61 MW · 2026-08-0563.21, 109.87 · 61 MW · 2026-08-0563.22, 109.86 · 61 MW · 2026-08-0563.22, 109.87 · 61 MW · 2026-08-05-5.44, 17.44 · 61 MW · 2026-08-05-11.34, 18.79 · 61 MW · 2026-08-05-9.53, 24.09 · 61 MW · 2026-08-05-9.52, 24.09 · 61 MW · 2026-08-05-10.96, 22.43 · 61 MW · 2026-08-0565.86, 100.33 · 61 MW · 2026-08-0568.34, 83.34 · 61 MW · 2026-08-0568.34, 83.35 · 61 MW · 2026-08-0568.35, 83.34 · 61 MW · 2026-08-0568.35, 83.35 · 61 MW · 2026-08-05-18.19, 47.80 · 61 MW · 2026-08-05-18.19, 47.81 · 61 MW · 2026-08-0565.38, 107.38 · 61 MW · 2026-08-0565.38, 107.38 · 61 MW · 2026-08-0565.39, 107.38 · 61 MW · 2026-08-0564.35, 115.81 · 61 MW · 2026-08-0564.35, 115.82 · 61 MW · 2026-08-0564.35, 115.81 · 61 MW · 2026-08-0564.35, 115.81 · 61 MW · 2026-08-05-17.56, 35.83 · 61 MW · 2026-08-0564.23, 114.90 · 61 MW · 2026-08-0564.24, 114.90 · 61 MW · 2026-08-0564.24, 114.90 · 61 MW · 2026-08-05-17.93, 34.95 · 61 MW · 2026-08-05-17.93, 34.95 · 61 MW · 2026-08-05-17.93, 34.95 · 61 MW · 2026-08-05-20.07, 34.56 · 61 MW · 2026-08-05-20.07, 34.55 · 61 MW · 2026-08-05-15.45, 15.18 · 61 MW · 2026-08-05-15.44, 15.18 · 61 MW · 2026-08-05-4.06, 14.27 · 61 MW · 2026-08-05-4.06, 14.27 · 61 MW · 2026-08-05-17.59, 33.95 · 61 MW · 2026-08-05-17.59, 33.95 · 61 MW · 2026-08-05-9.57, 22.37 · 61 MW · 2026-08-05-9.57, 22.37 · 61 MW · 2026-08-05-9.57, 22.37 · 61 MW · 2026-08-05-19.10, 123.20 · 61 MW · 2026-08-05-19.10, 123.20 · 61 MW · 2026-08-0532.73, -87.39 · 61 MW · 2026-08-0532.73, -87.39 · 61 MW · 2026-08-05-14.45, 16.19 · 61 MW · 2026-08-05-6.58, 25.34 · 60 MW · 2026-08-0567.95, 83.52 · 60 MW · 2026-08-05-9.70, 21.82 · 60 MW · 2026-08-05-9.69, 21.82 · 60 MW · 2026-08-05-11.69, 24.47 · 60 MW · 2026-08-05-11.69, 24.48 · 60 MW · 2026-08-05-11.68, 24.48 · 60 MW · 2026-08-0538.93, -112.25 · 60 MW · 2026-08-0538.94, -112.24 · 60 MW · 2026-08-0538.94, -112.25 · 60 MW · 2026-08-0538.94, -112.24 · 60 MW · 2026-08-0511.30, 41.52 · 60 MW · 2026-08-0511.30, 41.52 · 60 MW · 2026-08-05-4.99, 18.69 · 60 MW · 2026-08-05-13.11, 26.04 · 60 MW · 2026-08-0535.02, 43.50 · 60 MW · 2026-08-05-18.30, 33.75 · 60 MW · 2026-08-05-4.13, 14.08 · 60 MW · 2026-08-05-4.13, 14.08 · 60 MW · 2026-08-05-15.13, 35.98 · 60 MW · 2026-08-0560.43, 96.51 · 60 MW · 2026-08-0560.43, 96.51 · 60 MW · 2026-08-0568.35, 83.30 · 60 MW · 2026-08-0568.35, 83.31 · 60 MW · 2026-08-05-11.15, -74.73 · 60 MW · 2026-08-05-11.15, -74.73 · 60 MW · 2026-08-05-2.71, 115.24 · 60 MW · 2026-08-0547.13, 33.18 · 60 MW · 2026-08-0547.13, 33.18 · 60 MW · 2026-08-0547.14, 33.18 · 60 MW · 2026-08-0547.96, -120.58 · 60 MW · 2026-08-0547.96, -120.58 · 60 MW · 2026-08-0538.94, -112.25 · 60 MW · 2026-08-05-28.37, 32.27 · 60 MW · 2026-08-05-17.12, 136.53 · 60 MW · 2026-08-05-17.12, 136.53 · 60 MW · 2026-08-05-6.11, 14.54 · 60 MW · 2026-08-05-9.08, 21.61 · 60 MW · 2026-08-05-9.08, 21.60 · 60 MW · 2026-08-05-9.08, 21.61 · 60 MW · 2026-08-0564.33, 97.37 · 60 MW · 2026-08-0564.33, 97.37 · 60 MW · 2026-08-05-7.25, 28.69 · 60 MW · 2026-08-05-13.87, 17.20 · 60 MW · 2026-08-05-6.80, 13.03 · 60 MW · 2026-08-05-6.80, 13.03 · 60 MW · 2026-08-05-20.97, 130.92 · 60 MW · 2026-08-05-20.97, 130.93 · 60 MW · 2026-08-0564.98, 110.17 · 60 MW · 2026-08-05-12.67, -50.64 · 60 MW · 2026-08-05-8.68, 17.18 · 60 MW · 2026-08-051.29, 116.78 · 60 MW · 2026-08-0560.42, 96.51 · 60 MW · 2026-08-0560.43, 96.50 · 60 MW · 2026-08-0565.16, 105.74 · 60 MW · 2026-08-05-10.60, 21.44 · 59 MW · 2026-08-05-10.60, 21.43 · 59 MW · 2026-08-0538.94, -112.22 · 59 MW · 2026-08-05-9.79, 21.80 · 59 MW · 2026-08-05-9.79, 21.80 · 59 MW · 2026-08-05-9.08, 21.60 · 59 MW · 2026-08-05-9.08, 21.61 · 59 MW · 2026-08-05-9.07, 21.61 · 59 MW · 2026-08-0565.76, 99.30 · 59 MW · 2026-08-05-16.71, 19.74 · 59 MW · 2026-08-05-8.96, 24.75 · 59 MW · 2026-08-05-8.95, 24.74 · 59 MW · 2026-08-05-8.95, 24.75 · 59 MW · 2026-08-0551.50, 128.22 · 59 MW · 2026-08-05-8.59, 18.86 · 59 MW · 2026-08-05-13.26, 40.29 · 59 MW · 2026-08-05-6.12, 14.07 · 59 MW · 2026-08-05-9.52, 24.09 · 59 MW · 2026-08-05-9.52, 24.09 · 59 MW · 2026-08-05-14.94, 25.01 · 59 MW · 2026-08-05-8.26, 25.67 · 59 MW · 2026-08-05-10.48, 22.14 · 59 MW · 2026-08-0565.70, 99.75 · 59 MW · 2026-08-0565.70, 99.76 · 59 MW · 2026-08-0565.71, 99.75 · 59 MW · 2026-08-0565.71, 99.75 · 59 MW · 2026-08-05-0.19, 111.67 · 59 MW · 2026-08-05-14.91, 24.77 · 59 MW · 2026-08-0564.74, 110.44 · 59 MW · 2026-08-0564.74, 110.45 · 59 MW · 2026-08-0564.74, 110.44 · 59 MW · 2026-08-05-7.03, 16.99 · 59 MW · 2026-08-05-7.03, 17.00 · 59 MW · 2026-08-05-7.03, 16.99 · 59 MW · 2026-08-05-7.03, 17.00 · 59 MW · 2026-08-0568.25, 107.39 · 59 MW · 2026-08-0568.25, 107.40 · 59 MW · 2026-08-0568.25, 107.39 · 59 MW · 2026-08-0568.26, 107.40 · 59 MW · 2026-08-05-16.80, 20.79 · 59 MW · 2026-08-05-16.80, 20.80 · 59 MW · 2026-08-0559.68, 88.23 · 59 MW · 2026-08-0559.68, 88.23 · 59 MW · 2026-08-0559.68, 88.24 · 59 MW · 2026-08-0564.99, 110.21 · 59 MW · 2026-08-0564.99, 110.21 · 59 MW · 2026-08-0565.00, 110.21 · 59 MW · 2026-08-0565.00, 110.21 · 59 MW · 2026-08-05-18.19, 31.87 · 59 MW · 2026-08-05-10.90, 20.31 · 59 MW · 2026-08-05-10.89, 20.31 · 59 MW · 2026-08-05-10.54, 15.65 · 59 MW · 2026-08-05-10.53, 15.65 · 59 MW · 2026-08-0547.13, 33.19 · 58 MW · 2026-08-0547.14, 33.18 · 58 MW · 2026-08-0547.14, 33.19 · 58 MW · 2026-08-05-8.96, 31.01 · 58 MW · 2026-08-05-7.54, 13.19 · 58 MW · 2026-08-0564.74, 110.45 · 58 MW · 2026-08-0564.74, 110.46 · 58 MW · 2026-08-05-5.64, 26.46 · 58 MW · 2026-08-05-5.64, 26.46 · 58 MW · 2026-08-05-5.63, 26.45 · 58 MW · 2026-08-05-5.63, 26.46 · 58 MW · 2026-08-0568.10, 83.44 · 58 MW · 2026-08-0568.10, 83.44 · 58 MW · 2026-08-0568.57, 108.63 · 58 MW · 2026-08-0568.57, 108.63 · 58 MW · 2026-08-05-10.19, 20.50 · 58 MW · 2026-08-05-10.19, 20.51 · 58 MW · 2026-08-05-10.19, 20.50 · 58 MW · 2026-08-05-9.84, 24.26 · 58 MW · 2026-08-05-9.84, 24.27 · 58 MW · 2026-08-05-9.84, 24.26 · 58 MW · 2026-08-05-9.84, 24.27 · 58 MW · 2026-08-05-15.70, 14.40 · 58 MW · 2026-08-05-15.70, 14.40 · 58 MW · 2026-08-050.23, 110.77 · 58 MW · 2026-08-050.23, 110.77 · 58 MW · 2026-08-05-8.24, 25.04 · 58 MW · 2026-08-05-8.23, 25.04 · 58 MW · 2026-08-05-8.23, 25.05 · 58 MW · 2026-08-05-15.15, 34.22 · 58 MW · 2026-08-05-8.98, 21.11 · 58 MW · 2026-08-05-8.98, 21.12 · 58 MW · 2026-08-05-8.98, 21.11 · 58 MW · 2026-08-05-8.98, 21.12 · 58 MW · 2026-08-05-12.37, 19.70 · 58 MW · 2026-08-0551.27, -121.91 · 58 MW · 2026-08-0551.28, -121.91 · 58 MW · 2026-08-0565.77, 99.80 · 58 MW · 2026-08-0565.78, 99.81 · 58 MW · 2026-08-0565.78, 99.79 · 58 MW · 2026-08-05-5.48, 26.12 · 58 MW · 2026-08-05-5.48, 26.13 · 58 MW · 2026-08-05-12.44, 20.63 · 58 MW · 2026-08-05-12.44, 20.64 · 58 MW · 2026-08-0565.15, 105.77 · 58 MW · 2026-08-0565.15, 105.78 · 58 MW · 2026-08-0565.15, 105.77 · 58 MW · 2026-08-0568.25, 107.40 · 58 MW · 2026-08-0568.25, 107.40 · 58 MW · 2026-08-0568.26, 107.39 · 58 MW · 2026-08-0568.26, 107.40 · 58 MW · 2026-08-05-7.37, 22.56 · 58 MW · 2026-08-05-7.37, 22.57 · 58 MW · 2026-08-05-16.86, 20.54 · 58 MW · 2026-08-0558.09, 106.56 · 58 MW · 2026-08-0559.93, 90.13 · 58 MW · 2026-08-05-5.53, 148.42 · 58 MW · 2026-08-050.84, 111.72 · 58 MW · 2026-08-0564.00, 112.55 · 58 MW · 2026-08-0564.00, 112.54 · 58 MW · 2026-08-05-12.72, 16.95 · 58 MW · 2026-08-05-20.07, 34.56 · 58 MW · 2026-08-05-20.07, 34.55 · 58 MW · 2026-08-05-20.07, 34.56 · 58 MW · 2026-08-05-25.48, 30.76 · 58 MW · 2026-08-05-16.34, 17.91 · 58 MW · 2026-08-05-25.19, 150.03 · 58 MW · 2026-08-05-8.52, 25.62 · 58 MW · 2026-08-0564.74, 110.43 · 58 MW · 2026-08-0564.74, 110.44 · 58 MW · 2026-08-0564.74, 110.43 · 58 MW · 2026-08-05-8.93, 19.15 · 58 MW · 2026-08-05-8.93, 19.15 · 58 MW · 2026-08-05-8.92, 19.14 · 58 MW · 2026-08-05-8.92, 19.15 · 58 MW · 2026-08-05-3.10, 14.28 · 58 MW · 2026-08-05-8.74, 23.33 · 58 MW · 2026-08-0564.33, 97.36 · 57 MW · 2026-08-0564.33, 97.36 · 57 MW · 2026-08-0568.10, 83.43 · 57 MW · 2026-08-0529.23, 19.70 · 57 MW · 2026-08-0546.67, 42.25 · 57 MW · 2026-08-0568.35, 102.30 · 57 MW · 2026-08-05-1.72, 110.18 · 57 MW · 2026-08-05-1.71, 110.18 · 57 MW · 2026-08-05-9.79, 21.80 · 57 MW · 2026-08-05-9.79, 21.80 · 57 MW · 2026-08-05-9.78, 21.80 · 57 MW · 2026-08-05-9.78, 21.80 · 57 MW · 2026-08-05-8.69, 22.49 · 57 MW · 2026-08-05-8.69, 22.49 · 57 MW · 2026-08-05-8.68, 22.49 · 57 MW · 2026-08-05-12.06, 18.08 · 57 MW · 2026-08-05-12.06, 18.09 · 57 MW · 2026-08-05-12.05, 18.08 · 57 MW · 2026-08-05-16.77, 20.79 · 57 MW · 2026-08-05-5.58, 14.29 · 57 MW · 2026-08-05-5.58, 14.30 · 57 MW · 2026-08-0538.69, -112.35 · 57 MW · 2026-08-0538.69, -112.34 · 57 MW · 2026-08-05-12.29, 20.04 · 57 MW · 2026-08-05-9.13, 14.36 · 57 MW · 2026-08-05-20.65, 34.40 · 57 MW · 2026-08-05-20.65, 34.40 · 57 MW · 2026-08-05-12.37, 21.31 · 57 MW · 2026-08-05-7.00, 18.04 · 57 MW · 2026-08-05-19.13, 123.11 · 57 MW · 2026-08-05-10.73, 15.90 · 57 MW · 2026-08-05-10.72, 15.90 · 57 MW · 2026-08-05-8.74, 22.21 · 57 MW · 2026-08-05-8.74, 22.21 · 57 MW · 2026-08-05-8.74, 22.21 · 57 MW · 2026-08-05-8.74, 22.21 · 57 MW · 2026-08-05-26.82, 30.51 · 57 MW · 2026-08-05-8.67, 31.41 · 57 MW · 2026-08-0568.38, 83.61 · 57 MW · 2026-08-05-4.92, 15.41 · 57 MW · 2026-08-0563.85, 95.44 · 57 MW · 2026-08-0563.98, 112.49 · 57 MW · 2026-08-0563.98, 112.50 · 57 MW · 2026-08-0563.98, 112.49 · 57 MW · 2026-08-05-8.58, 18.86 · 57 MW · 2026-08-0564.34, 97.43 · 57 MW · 2026-08-0564.35, 97.44 · 57 MW · 2026-08-0564.35, 97.44 · 57 MW · 2026-08-05-5.34, 13.74 · 57 MW · 2026-08-05-17.87, 34.53 · 57 MW · 2026-08-051.92, 115.05 · 57 MW · 2026-08-0541.70, 15.54 · 57 MW · 2026-08-0551.23, -122.67 · 57 MW · 2026-08-0551.23, -122.66 · 57 MW · 2026-08-054.91, 35.57 · 57 MW · 2026-08-05-9.94, 21.08 · 57 MW · 2026-08-05-9.93, 21.07 · 57 MW · 2026-08-0565.39, 107.25 · 57 MW · 2026-08-0565.39, 107.26 · 57 MW · 2026-08-0565.39, 107.25 · 57 MW · 2026-08-0565.39, 107.26 · 57 MW · 2026-08-0554.44, 37.47 · 57 MW · 2026-08-0568.11, 83.48 · 57 MW · 2026-08-0568.11, 83.49 · 57 MW · 2026-08-0568.12, 83.48 · 57 MW · 2026-08-05-11.12, 19.73 · 57 MW · 2026-08-0565.01, 110.09 · 57 MW · 2026-08-05-20.98, 130.90 · 57 MW · 2026-08-05-20.98, 130.90 · 57 MW · 2026-08-05-2.57, 13.92 · 57 MW · 2026-08-05-7.87, 22.83 · 57 MW · 2026-08-05-7.87, 22.83 · 57 MW · 2026-08-05-7.87, 22.83 · 57 MW · 2026-08-05-12.39, 22.62 · 57 MW · 2026-08-05-12.38, 22.62 · 57 MW · 2026-08-05-8.61, 19.30 · 57 MW · 2026-08-05-8.60, 19.30 · 57 MW · 2026-08-05-8.60, 19.30 · 57 MW · 2026-08-05-20.98, 130.91 · 57 MW · 2026-08-05-20.98, 130.91 · 57 MW · 2026-08-05-11.26, 16.23 · 57 MW · 2026-08-05-14.44, 141.58 · 57 MW · 2026-08-05-12.65, 26.19 · 56 MW · 2026-08-05-12.64, 26.19 · 56 MW · 2026-08-05-12.64, 26.18 · 56 MW · 2026-08-05-10.87, 30.26 · 56 MW · 2026-08-05-8.58, 18.89 · 56 MW · 2026-08-05-8.57, 18.89 · 56 MW · 2026-08-0564.73, 110.47 · 56 MW · 2026-08-0564.73, 110.47 · 56 MW · 2026-08-05-24.78, 26.97 · 56 MW · 2026-08-0564.31, 95.00 · 56 MW · 2026-08-05-15.44, 15.14 · 56 MW · 2026-08-0565.38, 107.36 · 56 MW · 2026-08-0565.38, 107.37 · 56 MW · 2026-08-0565.39, 107.36 · 56 MW · 2026-08-0565.39, 107.37 · 56 MW · 2026-08-0545.29, -121.58 · 56 MW · 2026-08-0545.30, -121.59 · 56 MW · 2026-08-0545.30, -121.58 · 56 MW · 2026-08-0545.30, -121.59 · 56 MW · 2026-08-05-8.44, 23.38 · 56 MW · 2026-08-05-8.43, 23.38 · 56 MW · 2026-08-05-10.46, 22.15 · 56 MW · 2026-08-05-10.46, 22.16 · 56 MW · 2026-08-05-6.98, -43.72 · 56 MW · 2026-08-05-6.98, -43.72 · 56 MW · 2026-08-05-7.78, 24.48 · 56 MW · 2026-08-0538.97, -112.20 · 56 MW · 2026-08-05-8.77, 17.01 · 56 MW · 2026-08-05-8.77, 17.02 · 56 MW · 2026-08-05-8.77, 17.01 · 56 MW · 2026-08-0539.38, -111.32 · 56 MW · 2026-08-0539.38, -111.31 · 56 MW · 2026-08-0539.38, -111.31 · 56 MW · 2026-08-05-28.01, 30.28 · 56 MW · 2026-08-05-28.01, 30.28 · 56 MW · 2026-08-05-12.47, -50.51 · 56 MW · 2026-08-05-12.46, -50.51 · 56 MW · 2026-08-05-12.46, -50.51 · 56 MW · 2026-08-05-15.94, 21.71 · 56 MW · 2026-08-05-14.98, 19.46 · 56 MW · 2026-08-05-14.97, 19.47 · 56 MW · 2026-08-05-7.62, 26.10 · 56 MW · 2026-08-0568.27, 106.74 · 56 MW · 2026-08-0565.70, 99.64 · 56 MW · 2026-08-0563.53, 80.70 · 56 MW · 2026-08-0563.53, 80.72 · 56 MW · 2026-08-0558.27, 68.47 · 56 MW · 2026-08-0558.27, 68.46 · 56 MW · 2026-08-05-11.10, 19.57 · 56 MW · 2026-08-05-11.09, 19.57 · 56 MW · 2026-08-0565.30, 107.33 · 56 MW · 2026-08-0565.30, 107.34 · 56 MW · 2026-08-05-6.18, 15.76 · 56 MW · 2026-08-05-12.94, 30.06 · 56 MW · 2026-08-05-12.94, 30.06 · 56 MW · 2026-08-0548.88, -120.63 · 56 MW · 2026-08-0548.88, -120.63 · 56 MW · 2026-08-05-9.14, 24.68 · 56 MW · 2026-08-05-13.41, 39.00 · 56 MW · 2026-08-0544.41, -120.50 · 56 MW · 2026-08-0565.43, 107.83 · 56 MW · 2026-08-0565.43, 107.84 · 56 MW · 2026-08-0565.43, 107.83 · 56 MW · 2026-08-0565.43, 107.84 · 56 MW · 2026-08-05-9.85, 24.27 · 56 MW · 2026-08-0544.40, -120.57 · 56 MW · 2026-08-0546.05, -113.68 · 56 MW · 2026-08-0568.14, 106.00 · 56 MW · 2026-08-0548.88, -120.63 · 56 MW · 2026-08-0548.88, -120.62 · 56 MW · 2026-08-0548.88, -120.63 · 56 MW · 2026-08-0548.88, -120.63 · 56 MW · 2026-08-0546.50, 32.79 · 56 MW · 2026-08-0546.50, 32.78 · 56 MW · 2026-08-05-14.79, 26.49 · 56 MW · 2026-08-0564.73, 110.48 · 56 MW · 2026-08-0564.73, 110.49 · 56 MW · 2026-08-05-12.14, 38.89 · 56 MW · 2026-08-05-12.14, 38.88 · 56 MW · 2026-08-05-9.07, 22.75 · 55 MW · 2026-08-05-9.07, 22.76 · 55 MW · 2026-08-05-9.07, 22.76 · 55 MW · 2026-08-0564.00, 112.51 · 55 MW · 2026-08-0564.00, 112.52 · 55 MW · 2026-08-05-11.40, 17.88 · 55 MW · 2026-08-05-3.22, 112.36 · 55 MW · 2026-08-05-18.41, 33.55 · 55 MW · 2026-08-05-13.08, 18.56 · 55 MW · 2026-08-05-13.08, 18.56 · 55 MW · 2026-08-05-13.08, 18.56 · 55 MW · 2026-08-05-8.36, -46.39 · 55 MW · 2026-08-05-6.07, 15.02 · 55 MW · 2026-08-05-6.07, 15.03 · 55 MW · 2026-08-0565.71, 99.74 · 55 MW · 2026-08-0565.71, 99.74 · 55 MW · 2026-08-0565.71, 99.75 · 55 MW · 2026-08-05-3.59, 18.34 · 55 MW · 2026-08-05-3.58, 18.35 · 55 MW · 2026-08-05-3.58, 18.35 · 55 MW · 2026-08-0564.67, 109.98 · 55 MW · 2026-08-0564.67, 109.99 · 55 MW · 2026-08-05-14.13, 18.23 · 55 MW · 2026-08-05-6.01, 14.09 · 55 MW · 2026-08-05-10.94, 22.29 · 55 MW · 2026-08-05-10.93, 22.28 · 55 MW · 2026-08-0567.55, 83.22 · 55 MW · 2026-08-0543.75, -80.28 · 55 MW · 2026-08-0543.76, -80.28 · 55 MW · 2026-08-05-11.86, 17.93 · 55 MW · 2026-08-05-9.72, 19.81 · 55 MW · 2026-08-05-9.72, 19.81 · 55 MW · 2026-08-05-9.72, 19.80 · 55 MW · 2026-08-05-9.72, 19.81 · 55 MW · 2026-08-05-16.37, 17.53 · 55 MW · 2026-08-05-16.37, 17.54 · 55 MW · 2026-08-05-16.37, 17.53 · 55 MW · 2026-08-05-16.37, 17.54 · 55 MW · 2026-08-0565.40, 87.71 · 55 MW · 2026-08-05-18.13, 34.38 · 55 MW · 2026-08-05-17.90, 35.49 · 55 MW · 2026-08-05-6.68, 26.55 · 55 MW · 2026-08-05-6.68, 26.56 · 55 MW · 2026-08-0564.74, 110.46 · 55 MW · 2026-08-0564.74, 110.47 · 55 MW · 2026-08-05-13.26, 27.75 · 55 MW · 2026-08-05-13.25, 27.75 · 55 MW · 2026-08-05-13.75, 16.17 · 55 MW · 2026-08-05-13.75, 16.17 · 55 MW · 2026-08-05-9.61, 18.44 · 55 MW · 2026-08-05-9.61, 18.44 · 55 MW · 2026-08-05-9.60, 18.44 · 55 MW · 2026-08-05-8.61, 24.28 · 55 MW · 2026-08-05-8.61, 24.29 · 55 MW · 2026-08-05-8.61, 24.28 · 55 MW · 2026-08-05-8.60, 24.29 · 55 MW · 2026-08-05-7.84, 24.80 · 55 MW · 2026-08-05-7.84, 24.81 · 55 MW · 2026-08-05-7.83, 24.80 · 55 MW · 2026-08-05-13.03, 16.85 · 55 MW · 2026-08-0564.37, 106.93 · 55 MW · 2026-08-0564.37, 106.94 · 55 MW · 2026-08-0564.38, 106.92 · 55 MW · 2026-08-05-7.05, -49.21 · 55 MW · 2026-08-0565.76, 99.81 · 55 MW · 2026-08-0565.76, 99.79 · 55 MW · 2026-08-0565.77, 99.80 · 55 MW · 2026-08-0546.35, 33.80 · 55 MW · 2026-08-05-20.99, 130.94 · 55 MW · 2026-08-05-20.99, 130.95 · 55 MW · 2026-08-05-20.98, 130.94 · 55 MW · 2026-08-05-20.98, 130.94 · 55 MW · 2026-08-0564.72, 91.69 · 55 MW · 2026-08-051.46, 115.38 · 55 MW · 2026-08-05-25.02, 30.28 · 55 MW · 2026-08-05-14.31, 39.41 · 55 MW · 2026-08-05-6.74, 24.64 · 55 MW · 2026-08-05-6.73, 24.63 · 55 MW · 2026-08-05-6.73, 24.64 · 55 MW · 2026-08-05-17.60, 30.95 · 55 MW · 2026-08-05-18.30, 33.75 · 55 MW · 2026-08-05-6.08, 14.77 · 55 MW · 2026-08-05-6.08, 14.77 · 55 MW · 2026-08-050.29, 110.41 · 55 MW · 2026-08-05-9.98, 16.49 · 55 MW · 2026-08-05-9.98, 16.49 · 55 MW · 2026-08-05-9.10, 29.61 · 55 MW · 2026-08-0551.18, -122.25 · 54 MW · 2026-08-0551.18, -122.24 · 54 MW · 2026-08-0551.18, -122.25 · 54 MW · 2026-08-0551.18, -122.24 · 54 MW · 2026-08-0564.72, 109.73 · 54 MW · 2026-08-0564.72, 109.72 · 54 MW · 2026-08-0564.72, 109.72 · 54 MW · 2026-08-05-0.58, 112.01 · 54 MW · 2026-08-05-14.99, 16.02 · 54 MW · 2026-08-05-9.34, 18.82 · 54 MW · 2026-08-05-9.33, 18.82 · 54 MW · 2026-08-05-9.33, 18.82 · 54 MW · 2026-08-0564.36, 115.81 · 54 MW · 2026-08-0564.36, 115.81 · 54 MW · 2026-08-0564.37, 115.80 · 54 MW · 2026-08-0564.37, 115.81 · 54 MW · 2026-08-0564.47, 100.82 · 54 MW · 2026-08-0564.47, 100.83 · 54 MW · 2026-08-05-7.63, 18.58 · 54 MW · 2026-08-05-10.95, 22.43 · 54 MW · 2026-08-05-10.95, 22.44 · 54 MW · 2026-08-05-17.91, 21.57 · 54 MW · 2026-08-0564.47, 100.91 · 54 MW · 2026-08-05-8.67, 17.60 · 54 MW · 2026-08-0559.31, 90.98 · 54 MW · 2026-08-0559.31, 90.99 · 54 MW · 2026-08-0559.31, 90.98 · 54 MW · 2026-08-0564.70, 110.45 · 54 MW · 2026-08-0564.70, 110.46 · 54 MW · 2026-08-0564.71, 110.45 · 54 MW · 2026-08-0547.65, 33.42 · 54 MW · 2026-08-0547.65, 33.43 · 54 MW · 2026-08-05-19.22, 20.13 · 54 MW · 2026-08-05-19.21, 20.13 · 54 MW · 2026-08-05-23.84, 29.44 · 54 MW · 2026-08-05-18.67, 33.76 · 54 MW · 2026-08-05-18.66, 33.75 · 54 MW · 2026-08-0564.72, 110.49 · 54 MW · 2026-08-0564.72, 110.50 · 54 MW · 2026-08-0511.30, 41.51 · 54 MW · 2026-08-0511.30, 41.52 · 54 MW · 2026-08-0564.89, 110.82 · 54 MW · 2026-08-0564.89, 110.81 · 54 MW · 2026-08-0564.90, 110.82 · 54 MW · 2026-08-05-9.53, 24.09 · 54 MW · 2026-08-05-9.53, 24.09 · 54 MW · 2026-08-05-10.40, 22.58 · 54 MW · 2026-08-05-10.40, 22.58 · 54 MW · 2026-08-05-10.40, 22.57 · 54 MW · 2026-08-05-10.40, 22.58 · 54 MW · 2026-08-05-9.13, 14.36 · 54 MW · 2026-08-05-8.85, 24.42 · 54 MW · 2026-08-05-8.85, 24.43 · 54 MW · 2026-08-05-8.84, 24.42 · 54 MW · 2026-08-05-8.84, 24.42 · 54 MW · 2026-08-0554.44, 37.46 · 54 MW · 2026-08-0554.44, 37.45 · 54 MW · 2026-08-05-32.37, 147.10 · 54 MW · 2026-08-05-32.37, 147.11 · 54 MW · 2026-08-05-32.37, 147.10 · 54 MW · 2026-08-0542.40, -116.84 · 54 MW · 2026-08-0542.41, -116.84 · 54 MW · 2026-08-0542.41, -116.85 · 54 MW · 2026-08-0542.41, -116.84 · 54 MW · 2026-08-05-8.11, 23.46 · 54 MW · 2026-08-05-20.99, 130.91 · 54 MW · 2026-08-05-20.99, 130.91 · 54 MW · 2026-08-05-20.98, 130.91 · 54 MW · 2026-08-05-20.98, 130.91 · 54 MW · 2026-08-05-19.10, 123.19 · 54 MW · 2026-08-05-10.60, 21.45 · 54 MW · 2026-08-05-10.60, 21.45 · 54 MW · 2026-08-05-10.60, 21.45 · 54 MW · 2026-08-05-7.01, 17.00 · 54 MW · 2026-08-05-7.01, 17.00 · 54 MW · 2026-08-05-8.51, 19.65 · 54 MW · 2026-08-05-8.50, 19.65 · 54 MW · 2026-08-05-13.55, 40.15 · 54 MW · 2026-08-05-8.60, 18.84 · 54 MW · 2026-08-05-14.66, 37.31 · 54 MW · 2026-08-0559.15, 87.91 · 54 MW · 2026-08-0559.15, 87.92 · 54 MW · 2026-08-0559.15, 87.92 · 54 MW · 2026-08-05-10.03, 15.62 · 54 MW · 2026-08-05-9.92, 24.09 · 54 MW · 2026-08-05-9.92, 24.10 · 54 MW · 2026-08-05-9.92, 24.09 · 54 MW · 2026-08-05-9.91, 24.09 · 54 MW · 2026-08-0566.08, 117.10 · 54 MW · 2026-08-0559.48, 88.51 · 54 MW · 2026-08-0559.48, 88.51 · 54 MW · 2026-08-0559.48, 88.51 · 54 MW · 2026-08-05-5.12, 14.16 · 54 MW · 2026-08-05-5.12, 14.16 · 54 MW · 2026-08-0551.50, 128.21 · 53 MW · 2026-08-05-12.09, 20.42 · 53 MW · 2026-08-05-9.43, 19.86 · 53 MW · 2026-08-05-9.42, 19.86 · 53 MW · 2026-08-05-9.16, 24.68 · 53 MW · 2026-08-05-9.15, 24.67 · 53 MW · 2026-08-05-9.15, 24.68 · 53 MW · 2026-08-0538.07, -83.78 · 53 MW · 2026-08-0564.34, 97.39 · 53 MW · 2026-08-0564.34, 97.40 · 53 MW · 2026-08-0564.34, 97.38 · 53 MW · 2026-08-0564.35, 97.39 · 53 MW · 2026-08-05-7.23, -45.77 · 53 MW · 2026-08-05-18.36, 33.52 · 53 MW · 2026-08-0518.01, -71.43 · 53 MW · 2026-08-05-9.53, 18.54 · 53 MW · 2026-08-05-9.53, 18.54 · 53 MW · 2026-08-05-9.53, 18.54 · 53 MW · 2026-08-0547.96, -120.59 · 53 MW · 2026-08-0547.97, -120.58 · 53 MW · 2026-08-05-8.55, 19.69 · 53 MW · 2026-08-05-8.54, 19.69 · 53 MW · 2026-08-0551.24, -122.71 · 53 MW · 2026-08-05-15.46, 36.23 · 53 MW · 2026-08-0565.71, 85.07 · 53 MW · 2026-08-0565.71, 85.08 · 53 MW · 2026-08-05-17.62, 34.44 · 53 MW · 2026-08-05-17.62, 34.43 · 53 MW · 2026-08-0565.38, 107.28 · 53 MW · 2026-08-0565.38, 107.28 · 53 MW · 2026-08-05-6.34, 23.16 · 53 MW · 2026-08-05-11.98, 28.25 · 53 MW · 2026-08-05-16.65, 17.75 · 53 MW · 2026-08-05-16.65, 17.75 · 53 MW · 2026-08-05-16.64, 17.75 · 53 MW · 2026-08-05-16.64, 17.75 · 53 MW · 2026-08-0567.32, 81.89 · 53 MW · 2026-08-0567.32, 81.89 · 53 MW · 2026-08-0567.33, 81.89 · 53 MW · 2026-08-05-24.78, 26.98 · 53 MW · 2026-08-05-24.77, 26.98 · 53 MW · 2026-08-0544.37, -119.73 · 53 MW · 2026-08-0544.37, -119.73 · 53 MW · 2026-08-0544.37, -119.73 · 53 MW · 2026-08-05-9.84, 24.26 · 53 MW · 2026-08-05-9.84, 24.27 · 53 MW · 2026-08-05-9.84, 24.26 · 53 MW · 2026-08-05-9.84, 24.27 · 53 MW · 2026-08-05-5.86, 15.27 · 53 MW · 2026-08-0565.72, 99.60 · 53 MW · 2026-08-0565.72, 99.61 · 53 MW · 2026-08-05-3.87, 143.10 · 53 MW · 2026-08-05-10.02, 18.62 · 53 MW · 2026-08-05-10.02, 18.62 · 53 MW · 2026-08-05-10.01, 18.62 · 53 MW · 2026-08-05-10.01, 18.62 · 53 MW · 2026-08-0539.37, -111.32 · 53 MW · 2026-08-0539.38, -111.32 · 53 MW · 2026-08-05-27.68, 31.26 · 53 MW · 2026-08-05-17.70, 34.34 · 53 MW · 2026-08-05-10.24, 20.09 · 53 MW · 2026-08-05-6.41, 17.48 · 53 MW · 2026-08-05-19.44, 44.72 · 53 MW · 2026-08-05-19.44, 44.73 · 53 MW · 2026-08-05-25.97, 30.43 · 53 MW · 2026-08-05-25.97, 30.44 · 53 MW · 2026-08-0568.26, 107.46 · 53 MW · 2026-08-0568.26, 107.47 · 53 MW · 2026-08-0548.00, -120.44 · 53 MW · 2026-08-0548.00, -120.44 · 53 MW · 2026-08-0548.00, -120.44 · 53 MW · 2026-08-0548.00, -120.44 · 53 MW · 2026-08-05-5.93, 17.22 · 53 MW · 2026-08-05-8.72, 29.99 · 52 MW · 2026-08-0565.43, 107.85 · 52 MW · 2026-08-0565.43, 107.86 · 52 MW · 2026-08-0565.44, 107.85 · 52 MW · 2026-08-0565.44, 107.86 · 52 MW · 2026-08-05-10.22, 33.04 · 52 MW · 2026-08-0546.61, 33.17 · 52 MW · 2026-08-05-25.66, 29.15 · 52 MW · 2026-08-05-8.02, 19.25 · 52 MW · 2026-08-0568.22, 83.68 · 52 MW · 2026-08-0568.22, 83.67 · 52 MW · 2026-08-05-3.16, 115.27 · 52 MW · 2026-08-05-7.88, 13.61 · 52 MW · 2026-08-05-12.37, 21.31 · 52 MW · 2026-08-05-12.37, 21.31 · 52 MW · 2026-08-05-4.00, 18.56 · 52 MW · 2026-08-05-17.97, 33.70 · 52 MW · 2026-08-05-17.97, 33.71 · 52 MW · 2026-08-05-17.97, 33.70 · 52 MW · 2026-08-05-8.26, 25.03 · 52 MW · 2026-08-05-8.25, 25.03 · 52 MW · 2026-08-05-8.25, 25.04 · 52 MW · 2026-08-05-16.35, -59.50 · 52 MW · 2026-08-05-8.81, 24.71 · 52 MW · 2026-08-05-8.80, 24.71 · 52 MW · 2026-08-05-8.80, 24.70 · 52 MW · 2026-08-05-8.80, 24.71 · 52 MW · 2026-08-05-6.99, 17.54 · 52 MW · 2026-08-05-11.00, 17.15 · 52 MW · 2026-08-0568.63, 109.34 · 52 MW · 2026-08-0568.63, 109.35 · 52 MW · 2026-08-05-10.03, 18.60 · 52 MW · 2026-08-05-7.05, -49.20 · 52 MW · 2026-08-05-17.14, 30.62 · 52 MW · 2026-08-05-17.14, 30.63 · 52 MW · 2026-08-0565.21, 97.98 · 52 MW · 2026-08-0565.22, 97.99 · 52 MW · 2026-08-0565.22, 97.98 · 52 MW · 2026-08-0539.38, -111.31 · 52 MW · 2026-08-0539.38, -111.31 · 52 MW · 2026-08-05-7.13, 24.13 · 52 MW · 2026-08-0568.10, 83.48 · 52 MW · 2026-08-0568.10, 83.49 · 52 MW · 2026-08-0568.10, 83.48 · 52 MW · 2026-08-0568.11, 83.49 · 52 MW · 2026-08-05-5.48, 26.12 · 52 MW · 2026-08-05-5.48, 26.13 · 52 MW · 2026-08-05-7.06, 26.74 · 52 MW · 2026-08-05-7.06, 26.74 · 52 MW · 2026-08-0545.65, -113.16 · 52 MW · 2026-08-05-8.23, 25.05 · 52 MW · 2026-08-0551.13, -121.75 · 52 MW · 2026-08-0551.13, -121.75 · 52 MW · 2026-08-0551.13, -121.75 · 52 MW · 2026-08-0551.19, -122.64 · 52 MW · 2026-08-0551.19, -122.64 · 52 MW · 2026-08-05-10.55, 21.03 · 52 MW · 2026-08-05-10.55, 21.03 · 52 MW · 2026-08-05-10.54, 21.03 · 52 MW · 2026-08-0564.34, 115.82 · 52 MW · 2026-08-05-3.07, 16.08 · 52 MW · 2026-08-05-7.93, 25.24 · 52 MW · 2026-08-05-10.38, 19.31 · 52 MW · 2026-08-05-10.38, 19.31 · 52 MW · 2026-08-05-6.12, 31.48 · 52 MW · 2026-08-05-6.73, 24.64 · 52 MW · 2026-08-05-6.53, 26.29 · 52 MW · 2026-08-05-6.53, 26.29 · 52 MW · 2026-08-05-9.86, 23.46 · 52 MW · 2026-08-05-10.40, 22.58 · 52 MW · 2026-08-05-10.40, 22.58 · 52 MW · 2026-08-05-10.40, 22.58 · 52 MW · 2026-08-05-10.40, 22.58 · 52 MW · 2026-08-05-10.28, 16.96 · 52 MW · 2026-08-05-2.69, 119.20 · 52 MW · 2026-08-05-7.83, 20.94 · 52 MW · 2026-08-05-7.83, 20.94 · 52 MW · 2026-08-05-7.83, 20.94 · 52 MW · 2026-08-05-7.83, 20.94 · 52 MW · 2026-08-05-7.39, 25.05 · 52 MW · 2026-08-05-7.39, 25.05 · 52 MW · 2026-08-05-7.38, 25.05 · 52 MW · 2026-08-0565.71, 99.74 · 52 MW · 2026-08-0565.72, 99.74 · 52 MW · 2026-08-0565.72, 99.73 · 52 MW · 2026-08-05-6.72, 26.53 · 51 MW · 2026-08-05-6.72, 26.53 · 51 MW · 2026-08-05-8.62, 24.46 · 51 MW · 2026-08-05-8.62, 24.46 · 51 MW · 2026-08-05-8.61, 24.46 · 51 MW · 2026-08-05-8.61, 24.46 · 51 MW · 2026-08-0565.70, 99.59 · 51 MW · 2026-08-0565.71, 99.60 · 51 MW · 2026-08-0565.71, 99.59 · 51 MW · 2026-08-0565.71, 99.60 · 51 MW · 2026-08-05-9.88, 27.03 · 51 MW · 2026-08-05-9.87, 27.03 · 51 MW · 2026-08-05-4.65, 18.76 · 51 MW · 2026-08-05-4.65, 18.76 · 51 MW · 2026-08-0568.40, 83.67 · 51 MW · 2026-08-0568.40, 83.68 · 51 MW · 2026-08-0568.26, 107.43 · 51 MW · 2026-08-0568.26, 107.44 · 51 MW · 2026-08-05-19.13, 123.12 · 51 MW · 2026-08-05-19.12, 123.12 · 51 MW · 2026-08-05-25.97, 30.41 · 51 MW · 2026-08-05-25.97, 30.41 · 51 MW · 2026-08-05-10.48, 22.14 · 51 MW · 2026-08-05-10.47, 22.14 · 51 MW · 2026-08-05-10.47, 22.14 · 51 MW · 2026-08-05-10.47, 22.14 · 51 MW · 2026-08-05-9.04, 23.66 · 51 MW · 2026-08-05-9.04, 23.67 · 51 MW · 2026-08-0564.20, 97.59 · 51 MW · 2026-08-0568.76, 109.60 · 51 MW · 2026-08-0568.76, 109.61 · 51 MW · 2026-08-0565.34, 107.27 · 51 MW · 2026-08-0565.34, 107.27 · 51 MW · 2026-08-05-10.82, 15.89 · 51 MW · 2026-08-05-6.96, -71.67 · 51 MW · 2026-08-0564.66, 109.96 · 51 MW · 2026-08-0564.66, 109.97 · 51 MW · 2026-08-05
LowMedHigh

Countries burning most right now

#CountryHotspots
1Angola17,107
2Zambia12,582
3Russia12,448
4Mozambique7,225
5DR Congo4,708
6United States4,172
7Indonesia2,758
8Australia2,435
9Brazil2,250
10Tanzania2,193
11Canada1,927
12South Africa1,765
13Ukraine1,267
14Papua New Guinea836
15Bolivia443

Counts cover the 71 countries SpaceRadar tracks. Satellites detect heat, so agricultural burning is included alongside wildfires.

Advertisement

Most intense fires on Earth right now

  1. 1
    Remote area
    Russia257 detections~25 km across
    14333 MW
  2. 2
    Remote area
    Russia570 detections~39.8 km across
    11547 MW
  3. 3
    Remote area
    Russia651 detections~48.8 km across
    11355 MW
  4. 4
    Remote area
    Zambia148 detections~36.5 km across
    11295 MW
  5. 5
    Remote area
    DR Congo63 detections~14.3 km across
    9720 MW
  6. 6
    Remote area
    Zambia72 detections~17.1 km across
    9346 MW
  7. 7
    Remote area
    Russia328 detections~13.7 km across
    9334 MW
  8. 8
    Remote area
    United States394 detections~45.7 km across
    8481 MW
  9. 9
    Remote area
    Russia252 detections~16.4 km across
    7906 MW
  10. 10
    Remote area
    DR Congo117 detections~27.8 km across
    7880 MW
  11. 11
    Remote area
    Russia192 detections~9.9 km across
    7587 MW
  12. 12
    Remote area
    Zambia68 detections~8.6 km across
    6553 MW
  13. 13
    Remote area
    Canada603 detections~82.7 km across
    6518 MW
  14. 14
    Remote area
    Russia237 detections~17.9 km across
    6491 MW
  15. 15
    Remote area
    United States506 detections~45.5 km across
    6045 MW

How this ranking works

Every number here comes from NASA's FIRMS system. The VIIRS instrument aboard the Suomi NPP and NOAA-20 satellites scans the whole planet several times a day and flags pixels burning at fire-level heat. We collect the last 24 hours worldwide, attribute each detection to a country and rank by count and total radiative power (FRP, in megawatts).

Two honest caveats: satellites detect heat, so crop burning and gas flares appear alongside wildfires, and cloud cover can hide fires from a passing satellite. This shows active burning — not fire perimeters or evacuation zones. Always follow local emergency services.

Advertisement